Similar Projects
SH-51 - Pavement Rehabilitation
Infrastructure
Conception
$3,000,000 CJ est. value
Mannford, OK 74044

Pavement Rehabilitation - SH 66
Infrastructure
Design
$5,269,170 CJ est. value
Bristow, OK 74010

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Emergency Waterline Repairs at Various Locations
Infrastructure
Post-Bid
Tulsa, OK

Kum & Go #2362 / Tulsa
New Construction, Infrastructure - 5,620 SF
Post-Bid
$2,000,000 CJ est. value
Tulsa, OK 74133

Water Castings, Manholes, Sealing Material and Anodes Water and Sewer Department
Alteration
Results
Tulsa, OK

Waterline Replacement
Infrastructure
Results
Tulsa, OK

Basin N04 Sanitary Sewer Rehabilitation
Infrastructure
Construction
$1,828,039 CJ est. value
Sapulpa, OK 74066

Basin N04 Sanitary Sewer Rehabilitation
Infrastructure
Construction
$1,828,039 CJ est. value
Sapulpa, OK 74066

New Pre-K Center - 2019 Bond - Bristow Public Schools
New Construction, Infrastructure
Pending Verification
$3,354,946 CJ est. value
Bristow, OK 74010

2019 Bond - Edison Elementary Renovations - Bristow Public Schools
Renovation, Infrastructure
Pending Verification
$546,293 CJ est. value
Bristow, OK 74010

US-75A - Utilities
Alteration
Design
$326,144 est. value
Mounds, OK 74047

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Resurface (Asphalt) - SH-67
Infrastructure
Results
$1,427,000 CJ est. value
Kiefer, OK 74041

Last Updated 03/08/2023 07:04 AM
Project Title

Utilities - SH 48

Physical Address View project details and contacts
City, State (County) Bristow, OK 74010   (Creek County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $386,250 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh 48: Begin at Creek/ Okfuskee Cl Extend North 6.5 Miles Ut for 3108704. As of March 08, 2023, the project is in Design status. Anticipated letting month/year is March, 2024. Length : 6.500 Mi. OKDOT - Utilities - SH 48 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents