Similar Projects
Last Updated | 04/28/2023 12:01 PM |
Project Title | RFQ Contractor - Gates County Schools Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Gatesville, NC 27938 (Gates County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Selection Underway, Request for Qualifications, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $13,000,000 [brand] Estimate |
Plans Available from | Sub-Contractor |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Gates County High School: This project consists of several different roof replacements. This includes the removal of approximately 7,200sf of tar and gravel roof over the existing High School Gym to be replaced with a TPO roof. The removal of approximately 6,642sf of tar and gravel roof with an elastomeric coating to be replaced with a TPO roof (Ag Building). The removal of approximately 3,675sf of gravel roof over the existing Art Room Building to be replaced with a TPO roof. Included in the Art Room Building new roof will be the structural infill of an approximate 375sf existing opening. Build-out of this opening may include structural steel (i.e. bar joist and metal decking) construction. Opening will become part of new TPO roof system. The replacement of approximately 8,360sf of existing TPO roof over the Performing Arts Building. Installation of new copings, gutters and downspouts as necessary. Gatesville Elementary School: This project consists of several areas of roof replacement. This includes the removal of approximately 14,700 sf of tar and gravel roof over an existing Classroom wing to be replaced with a TPO roof to be performed over the summer of 2023. There are existing height differences (knee walls) of up to 36" between sections of this roof. The removal of approximately 7,200 sf of tar and gravel roof over the Gym to be replaced with a TPO roof over the summer of 2024. Installation of new copings, gutters and downspouts as necessary. Construction Duration: 3 months Performance & Payment Bond: May be required for Bid Packages $500,000 or higher Award Date 1 Work Days Fri Apr 28, 2023 1 Calendar Days from Submit to Owner Proposed Low Bidders Construction Start 32 Work Days Mon Jun 12, 2023 46 Calendar Days from Submit to Owner Proposed Low Bidders |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |