Last Updated 11/09/2021 08:30 AM
Project Title

Roadway Rehabilitation FY2021

Physical Address View project details and contacts
City, State (County) Leander, TX 78641 (Travis, Williamson Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,572,114
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the edge mill and overlay or mill and overlay to include multiple full-depth repairs of various roadway segments of Crystal Falls Pkwy, Greening Way, Deep Woods Trail, Twisted Oak Drive, Madrone Trail, Bent Oak Cove, Laurel Lane, Sequoia Drive, Columbine Lane, Mimosa Lane, Primrose Lane, Vista Drive, Muledeer Run, Honeybee Lane, Dove Ridge Trail, Holly Hill Drive, Overland Drive, Cimarron Cove, Sequoia Cove with multiple full-depth repairs as a base bid. Additionally, bid alternates include the mill and overlay of Sedona, Phantom Horse, Shawnee, Shamrock Drive, Emerald Isla Drive, Ruby Isle Drive, West Drive, Ireland Drive, Dublin Drive, County Cork Lane, Limerick Lane, Londonderry Drive, Killarney Drive, Tyrone Drive, New Castle Lane, Tipperary Drive, Wicklow Drive, Darby Lane, Shannon Circle, Erin Circle, Hernandos Loops with multiple full-depth repairs in the City of Leander.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents