Similar Projects
School Lane Improvements - Phase 2
Infrastructure
Post-Bid
$165,000 est. value
Stowe, PA

2020 Whitemarsh Township Intersection Improvements Program
Results
Lafayette Hill, PA 19444

ADA Improvements - Bob White and Swedeland Parks
Results
King of Prussia, Wayne, PA 19087

Ursinus College Main Street Pedestrian Improvements
New Construction
Construction
Collegeville, PA 19426

Erdenheim Elementary School and Springfield Township Middle School Parking Lot Maintenance
Results
Oreland, PA 19075

Construct Parking Lot - Merion Elementary School
Results
Merion Stanton, PA

Sidewalk and ADA Ramps Installation Along Susquehanna Road and Spark Drive
Results
$50,000 to $150,000 est. value
Fort Washington, PA 19034

Municipal Complex Parking Lot Improvements
Results
Norristown, PA 19403

Main Street ADA Ramp and Curb Replacement Project
Results
Royersford, PA 19468

Germantown Pike Pedestrian Crossing
Results
Lafayette Hill, PA 19444

Fort Washington Cross County Trail and Road Diet, Phase 1
Results
$2,500,000 to $3,500,000 est. value
Fort Washington, PA 19034

Liberty Bell Trail through Stony Creek Park
Results
$175,000 to $200,000 est. value
Lansdale, PA 19446

Bio-Retention Basin
Results
Red Hill, PA 18076

West Conshohocken & Merion Drive Parking Lot
Results
$200,000 to $225,000 est. value
West Conshohocken, PA 19428

2020 ADA Ramp Replacement Project
Results
$469,000 est. value
Kulpsville, PA 19443

Last Updated 09/10/2021 10:02 AM
Project Title

ADA Compliance - Removal of Architectural Barriers

Physical Address View project details and contacts
City, State (County) West Conshohocken, PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000 to $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of Architectural Barriers 2020 CDBG GRANT The Scope of Work the removal of the existing concrete curb, sidewalk and ramps. Installation of new ADA ramps with detectable warning surface located in the Borough. The work consists of concrete sidewalk, curbs, ramps with detectable warning surface, crosswalk striping and associated pavement and lawn restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents