Similar Projects
Diventures / Sun Prairie
New Construction, Infrastructure - 10,500 SF
Design
$2,500,000 CJ est. value
Sun Prairie, WI 53590

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53711

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53711

2021 Road Overlays
Post-Bid
Sun Prairie, WI

2021 MLS/LRIP-S Road Reconstruction and Overlay
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Town Road Improvements
Results
Waunakee, WI 53597

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

RFQ Design - Phased Modernization of the USGS National Wildlife Health Center in Madison
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Madison, WI 53711

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Ridgewood Way Overlay
Infrastructure
Post-Bid
Madison, WI 53713

Roadwork Bids
Results
Belleville, WI

Headquarters Roof Replacement
Renovation, Infrastructure
Construction
$2,282,538 CJ est. value
Madison, WI 53703

Last Updated 01/19/2023 06:41 AM
Project Title

STH 78 - USH 14 Const / Bridge Replacement

Physical Address View project details and contacts
City, State (County) Black Earth, WI 53515   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $661,832 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Dane County; 5572-00-72, B-13-0883 ,WISC 2023 141; CTH KP; 0.044 Miles; Excavation, Base, HMA Pavement, Curb and Gutter, Sidewalk, Signs, Pavement Marking, and Bridge Replacement Estimate Anticipated Funding $500,000 - $749,999 WisDOT -07- STH 78 - USH 14 Const / Bridge Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents