Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

2021 LMIG Paving Project
Post-Bid
Buford, GA

T32-D1-Pvmt Pres-SR 403/I-85 Gwinnett-109238
Results
GA

LMIG Street Resurfacing
Results
College Park, GA 30337

COL/LMIG
Post-Bid
Lilburn, GA

Collins Industrial Way Roadway Improvement
Results
Lawrenceville, GA 30043

2021 Annual LMIG Resurfacing Project
Infrastructure
Post-Bid
Lawrenceville, GA

Roadway Improvements on Various City Roads
Results
Sugar Hill, GA

Triple Surface Treatment of South Richland Creek Road
Infrastructure
Post-Bid
Sugar Hill, GA 30518

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 1 and 2
Results
Ellenwood, Forest Park, Lawrenceville, Macon, Morrow, Rex, Riverdale, Stockbridge, Union City, Warner Robins, Woodstock, GA 30294

2021 Street Resurfacing
Infrastructure
Post-Bid
Norcross, GA

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Town Center Roadway Improvements
Infrastructure
Post-Bid
Snellville, GA

Resurfacing of County Roads
Results
Buford, Grayson, Lawrenceville, Lilburn, Norcross, GA 30515

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Last Updated 06/24/2022 04:43 PM
Project Title

Connector St From Hewatt Rd to Britt Dr; Inc Parkwood Rd

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $9,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project is needed to enhance access to local property owners along the SR 10/US 78 corridor, to start the connector street system, and deal with an increase in future traffic volumes. Currently 25 commercial property owners located along the north side of SR 10/US 78 from Hewatt Road to Britt Drive do not have a reasonable means of accessing the eastbound travel lanes of SR 10/US 78 due to the recent construction of a raised median in front of the commercial properties. The purpose of the proposed project is to provide property owners along the north side of SR 10/US 78 from Hewatt Road to Britt Drive an alternative means of accessing the eastbound lanes at the controlled intersections of Hewatt Road/Britt Drive and SR 10/US 78. County: Chatham, Gwinnett As of June 23, 2022, the project is in Final planning status. Anticipated letting Month is June, 2022. GADOT - Connector St From Hewatt Rd to Britt Dr; Inc Parkwood Rd *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents