Similar Projects
Sycamore Road Self-Storage Facility
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Dekalb, IL 60115

2024 Bond - Central School District 301
New Construction, Infrastructure, Renovation
Conception
$195,000,000 CJ est. value
Sycamore, IL 60178

First United Methodist Church
New Construction, Infrastructure - 10,986 SF
Design
$600,000 CJ est. value
Dekalb, IL 60115

2023 Peace Road Crossings - Sycamore Creek Paving Improvment
Infrastructure
Bidding
$3,000,000 CJ est. value
Sycamore, IL 60178

2023 Peace Road Crossings - Sycamore Creek Paving Improvment
Infrastructure
Bidding
$3,000,000 CJ est. value
Sycamore, IL 60178

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

2022 Water Main and Street Improvements
Infrastructure, Alteration
Results
$261,663,380 to $281,359,980 est. value
Sycamore, IL 60178

2022 Watermain Replacement North 14th Street
Infrastructure
Results
$972,867 est. value
Dekalb, IL 60115

Construct Northern Illinois Center for Community Sustainability - Northern Illinois University
New Construction, Infrastructure - 30,000 SF
Pending Verification
$24,000,000 CJ est. value
Dekalb, IL 60115

McDonald's Remodel / DeKalb
Infrastructure, Build-out
Pending Verification
$1,000,000 CJ est. value
Dekalb, IL 60115

2023 Road Program
Infrastructure
Bidding
$100,000 CJ est. value
Hinckley, IL 60520

Milling and Resurfacing on IL 38. Some ADA Work and Traffic Signal Improvements Are Proposed
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Dekalb, IL 60115

Kingston Elementary School Site Paving
Infrastructure
Results
Kingston, IL 60145

Lacey's Place
New Construction, Renovation, Infrastructure - 2,000 SF
Pending Verification
$300,000 CJ est. value
Dekalb, IL 60115

Last Updated 08/15/2023 01:02 AM
Project Title

Streetscape Improvements Along US 30

Physical Address View project details and contacts
City, State (County) Dekalb, IL 60115   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,654,900 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Streetscape improvements along US 30 from South Shabbona Road to Illini Road in Shabbona Region 2 District 3 Federal Project # U4SL(231) County(S) DeKalb Key Route(S) FAP 573 Marked Route(S) US 30 Section(S) 23-00019-01-LS (SHABBONA) State Job #(S) C-93-028-24 Pps #(S) 0-00914-3001 3-10785-0000 Completion Date is 60 Working Days Questions not accepted as of July 25, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 068- Streetscape Improvements Along US 30

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents