Similar Projects
Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Conception
$12,100,000 CJ est. value
Rogers, AR 72758

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Conception
$12,100,000 CJ est. value
Rogers, AR 72758

Bentonville Public Library Expansion
Addition, Renovation, Infrastructure - 65,055 SF
Design
$12,000,000 CJ est. value
Bentonville, AR 72712

Rogers Ped. Impts. (TAP-19) (S)
Infrastructure
Design
$500,000 CJ est. value
Rogers, AR 72756

Police Training Facility
New Construction, Infrastructure
Bidding
$1,650,000 CJ est. value
Bentonville, AR 72713

Razorback Greenway Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Bentonville, AR 72756

New Administration Building Siloam Springs School District
New Construction, Infrastructure - 20,399 SF
Sub-Bidding
$6,000,000 CJ est. value
Siloam Springs, AR 72761

Construction of AWIN Tower Site Work Designs
Infrastructure
Post-Bid
Little Flock, AR

Design and Construction of Widening Greenhouse Road from Highway 12 to Highway 102
Infrastructure
Post-Bid
Bentonville, AR 72716

Asphalt Milling-Paving
Results
Rogers, AR

Prairie Grove and Siloam Springs Overlay
Results
Prairie Grove, Siloam Springs, AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

Starbucks / Bentonville
New Construction, Infrastructure
Construction
$800,000 CJ est. value
Bentonville, AR 72712

The Motto
New Construction - 17,000 SF
Pending Verification
Bentonville, AR 72712

Slaughter Pen West Parking
Renovation, Infrastructure
Pending Verification
Bentonville, AR 72712

Last Updated 08/16/2022 04:08 PM
Project Title

East Central Avenue Hotel

Physical Address View project details and contacts
City, State (County) Bentonville, AR 72712   (Benton County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $35,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 6 story, 116,473 square foot new hotel. Further scope details have not been provided. As of August 2022, the project is in the early design stages, and received conditional use permit approval from the City of Bentonville. Information regarding a general contractor has not been provided. A firm construction timeline has not been announced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

6 Stories Above Grade, 116,473 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents