Similar Projects
New A/C Unit for Ft Dodge
Renovation
Design
$100,000 CJ est. value
Anamosa, IA 52205

Southwest Valley High School Boiler and Gym HVAC Replacement
Renovation
Sub-Bidding
$3,000,000 CJ est. value
Corning, IA 50841

Improve Terminal Building (Upgrade HVAC System Controls)
Renovation
Sub-Bidding
$500,000 CJ est. value
Waterloo, IA 50703

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Ho-Chunk to Heritage Parking Ramp Skywalk Upgrades
Alteration
Post-Bid
Sioux City, IA 51101

Mitsubishi HVAC Cassette Units
Alteration
Results
Cedar Rapids, IA

HVAC Services for ImOn Ice Arena
Alteration
Results
Cedar Rapids, IA 52404

Cyride 2023 HVAC Improvement Project
Renovation
Sub-Bidding
$500,000 CJ est. value
Ames, IA 50011

Hawthorne Elementary HVAC Upgrades
Alteration
Post-Bid
Keokuk, IA 52632

West Elementary and Junior and Senior High School HVAC Upgrades
Alteration
Results
Independence, IA 50644

Laboratory Freezer
Alteration
Post-Bid
Davenport, IA

Skywalk HVAC Replacement Phase 4
Alteration
Results
Less than $150,000 est. value
Des Moines, IA

Washington CSD High School Mechanical Upgrades
Alteration
Post-Bid
Washington, IA 52353

Marion High School HVAC Upgrades
Alteration
Results
Marion, IA 52302

Water System Improvements
Term Contract
Post-Bid
Storm Lake, IA 50588

Last Updated 02/21/2023 09:18 AM
Project Title

Blessed Sacrament Catholic Church HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Waterloo, IA 50701   (Black Hawk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Owner To Subcontract, Bids by Invitation
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Thisprojectconsistsofareplacementofthecentralheatingplant(boilersystem),airhandling unitservingthesanctuary,andblowercoilsservingtherectory,office,basement,andsacristy. Theequipmentreplacementwillbeaone-for-onestylereplacementwithmodernequipment. Theexistingpipingdistributionotherthanwhatisindicatedintheplanstobereplacedshall remain.NewDDCcontrolsincludinganewheadendwebserverwillbeaddedtocontrolthe equipmentlistedaswellasexistingcabinetunitheatersandfintuberadiators.Theprojectalso includesalloftheelectricalworkrequiredtoenergizethenewequipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents