Similar Projects
Pittsburgh Theological Seminary - Institutional Master Plan - Phase 1
Renovation
Conception
Pittsburgh, PA 15206

Pittsburgh Theological Seminary Phase 1 - 1 Improvements to North and East Campus Circulation
Renovation
Conception
Pittsburgh, PA 15206

Osteopathic Medicine School
New Construction - 80,000 SF
Design
$60,000,000 est. value
Pittsburgh, PA 15219

CMU Institutional Master Plan - South Wing of Wean Hall Building 2
Renovation
Design
Pittsburgh, PA 15213

Gateway Middle School - Additions & Renovations (General Construction)
Renovation
Bidding
Monroeville, PA 15146

Design Assist RFQ - Ostermayer Lab Building Renovation
Renovation - 21,739 SF
Post-Bid
PA

Cathedral of Learning Ground Floor Renovation - General Construction
Renovation
Post-Bid
$2,000,000 to $2,500,000 est. value
Pittsburgh, PA 15260

Summer 2019 Capital Improvements
Results
PA

Pittsburgh Brashear High School Locker Room Renovations, Phase 1 - General, Plumbing, Mechanical, Electrical and Asbestos Abatement Primes
Renovation
Results
Pittsburgh, PA 15216

Scaife Hall Engineering Building Replacement
New Construction - 120,000 SF
Construction
$50,000,000 est. value
Pittsburgh, PA 15213

Plumbing Training Mezzanine and Roof Replacement
Renovation
Construction
$403,660 est. value
Pittsburgh, PA 15204

Pittsburgh Theological Seminary Phase 1 - 2 Bus Shelter on North Highland Avenue
Renovation
Conception
Pittsburgh, PA 15206

CMU Institutional Master Plan - New Scaife Replacement Building 3
New Construction, Renovation - 85,000 SF
Design
Pittsburgh, PA 15213

Misc. Interior Renovations - North Allegheny Senior Highs School
Renovation
Post-Bid
Pittsburgh, PA 15237

Gateway High School - Auditorium Retaining Wall Project
Results
Monroeville, PA 15146

Last Updated 11/27/2019 10:37 AM
Project Title

Gymnasium and Site Improvements for Existing Vocational School

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15204   (Allegheny County)
Category(s) Education
Sub-Category(s) College/University, Middle/Senior High School
Contracting Method
Project Status Construction Commenced July 2019, Construction Complete as of November 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Middle/Senior High School, 468 SF Renovation 119 Parking Spaces.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 08 - Openings.
Division 09 - Finishes.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents