Similar Projects
On-Call Concrete Services
Term Contract
Post-Bid
Olivette, MO

Sunset Hills Selected Slab Replacement Package
Alteration
Post-Bid
$800,000 est. value
Sunset Hills, MO

Public Works Salt Storage Slab
Alteration
Results
Olivette, MO 63132

2022 Concrete Street Slab Replacement
Alteration
Results
Crestwood, MO

2022 Hazelwood Asphalt Improvements Project
Infrastructure
Construction
$320,000 CJ est. value
Hazelwood, MO 63042

Quazite Pull Boxes and Lids
Alteration
Post-Bid
Clayton, MO

2022 Concrete Slabs
Alteration
Results
Ballwin, MO

Concrete and Brick Removal / Replacement and Complete Sidewalk Replacement
Infrastructure, Alteration
Post-Bid
$687,130 est. value
Saint Louis, MO

Concrete Pre Mix
Term Contract
Results
$12,000 est. value
Chesterfield, MO

Polymer Concrete
Term Contract
Post-Bid
Ballwin, MO 63011

Concrete Slab Replacements-Spring Valley Woods
Infrastructure, Alteration
Results
$350,000 est. value
Des Peres, MO

2022 Concrete Repair and Restoration
Alteration
Results
$200,000 est. value
Breckenridge Hills, MO 63114

Concrete and Asphalt Repair/Replacement
Infrastructure, Alteration
Results
$100,000 est. value
Florissant, MO

Concrete and Brick Removal / Replacement and Complete Sidewalk Installation
Infrastructure
Results
$1,093,985 CJ est. value
Saint Louis, MO 63103

Saint Louis County IT Office and Hoteling Remodel
Build-out
Results
$647,883 CJ est. value
Clayton, MO 63105

Last Updated 05/03/2023 09:06 AM
Project Title

Resurface and Rehabilitate Paved Trail, Phase-1

Physical Address View project details and contacts
City, State (County) Wildwood, MO 63005   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $453,896 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. The work consists of upgrades to existing pedestrian trail. The work includes asphalt pavement repair, asphalt overlay of existing trail, widening of existing trail, storm culvert and headwall replacement. The trail improvements will be from Station 0+00 to Station 41+66 and Station 55+00 to Station 85+45. Project will be bid as a lump-sum project. Phase-1 has an Add- Alternate bid item to adjust the trail's vertical alignment and add low water crossings near Stations 29+35 and 34+00. B. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents