Similar Projects
Install Shade Structures for Hazmat Containers and Chiller Control Panels
Bidding
$25,000 to $100,000 est. value
Maricopa, AZ 85138

Install Shade Structures for Hazmat Containers and Chiller Control Panels
Bidding
$25,000 to $100,000 est. value
Maricopa, AZ 85138

Exterior Repairs of Public Rental Units
Post-Bid
Chinle, AZ 86504

General Contractor for the Weatherization Project at Curiel Primary School
Post-Bid
Eloy, AZ 85131

Z--Apply Clear Top Coat to Exterior Log Cabin Walls
Results
Littlefield, AZ 86432

Weatherization Project at Desert Vista High School
Results
Phoenix, AZ 85048

Amplify - Phase II
Renovation - 65,022 SF
Pending Verification
$415,000 est. value
Chandler, AZ 85226

Install Shade Structures For Research Equipment
Bidding
Maricopa, AZ 85239

Eloy Main Street Renovation Project
Post-Bid
Eloy, AZ 85231

Downtown Facade Improvements Phase 2
Results
$160,000 to $200,000 est. value
Mesa, AZ 85211

Install Shade Structures Over Gov Parking Lot
Bidding
$25,000 to $100,000 est. value
Maricopa, AZ 85138

KBS Playground Tile Repair
Post-Bid
Kaibito, AZ

Exterior Repairs for Public Rental Units - ALAMO
Results
Window Rock, AZ 86515

Palo Verde Elementary School Weatherization
Bidding
Casa Grande, AZ 85122

Exterior Repairs for Public Rental Units
Post-Bid
Many Farms, AZ

Last Updated 12/18/2019 03:38 PM
Project Title

Z--LAKE19-1375-Repair the Foundation at KL Qrtrs 105

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ 86429   (Mohave County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the following: Repair of the foundation slab. 1. Excavating approximately 172 LF of the building foundation. 2. Remove (chip away) failing concrete and remove/cut failing reinforcing steel. 3. Place new concrete foundation, attached to the existing foundation using reinforcing steel dowels and epoxy to existing concrete. 4. Remove and replace rear patio concrete pad (+/- 12’x20’). 5. Removal of the debris outside of park. 6. Backfill, regrade,and restore all the disturbed areas.

Details

Division 09 - Finishes.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents