Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Edwardsville, IL 62025

Smith Lake Drainage Improvements - City of Wood River
Infrastructure
Conception
$1,900,000 CJ est. value
Wood River, IL 62095

Installation of a Second Water Meeting from Bethalto Water to Moreland Road
Infrastructure
Design
$1,750,000 CJ est. value
Bethalto, IL 62010

Tolle Lane Project Phase 2 - City of Godfrey
Infrastructure
Design
$546,750 CJ est. value
Godfrey, IL 62035

2023 Concrete Pavement Replacement Project
Infrastructure
Bidding
$397,000 CJ est. value
Godfrey, IL 62035

Bethalto Maintenance Garage
New Construction, Infrastructure - 7,500 SF
Bidding
$800,000 CJ est. value
Bethalto, IL 62010

Wood River Recreation Center
New Construction, Infrastructure
Post-Bid
$7,500,000 CJ est. value
Wood River, IL 62095

Melvin Price Lock & Dam Main Lock Lift Gate Install & Machinery Replacement
Infrastructure
Post-Bid
$30,485,095 CJ est. value
East Alton, IL 62024

Road Improvements
Infrastructure
Results
Granite City, IL

Structure Installation
Infrastructure
Results
Godfrey, IL 62035

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Addition and Renovation Dorris Intermediate School
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Construction
$6,000,000 CJ est. value
Collinsville, IL 62234

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

2022 Bond - Highland Primary School and Middle School Addition - Highland CUSD #5
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Highland, IL 62249

Water Meters / Wood River
Infrastructure
Conception
$853,058 CJ est. value
Wood River, IL 62095

Last Updated 03/16/2023 12:31 AM
Project Title

North Alton Provide and Install 35ft US Flag

Physical Address View project details and contacts
City, State (County) Alton, IL 62002   (Madison County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Funeral Facility, Site Development
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Number: 077-MM21-015; Provide and Install 35 Ft. Flagpole and Flagpole Lighting at the North Alton Confederate Cemetery 0001 - The contractor shall provide all labor, materials, tools, equipment, transportation, and supervision to remove/ dispose of approximately 160 LF of an existing 3/4 " waterline (not connected), provide and install flagpole base, flagpole and lighting for flagpole on the northeastern portion of the cemetery and in alignment with the obelisk in accordance with the attached scope of work, specifications, and drawings. 100% Small Business Set-a-Side Small Business Size Standard: $45M NAICS: 237990 Disclosure of Magnitude: Between $25,000 and $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Structural Concrete, Precast Structural Concrete, Grouting, Cementitious Grouting, Concrete Cutting.
Division 04 - Masonry, Common Work Results for Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Windows, Door Hardware, Window Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Flagpoles.
Division 11 - Equipment, Mortuary Equipment.
Division 12 - Furnishings, Art, Casework, Furnishings and Accessories, Rugs and Mats, Furniture.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Sidewalks, Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Storm Drainage Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents