Similar Projects
Grand Ridge over Bills Run - Grundy County
Infrastructure
Conception
$600,000 CJ est. value
Grand Ridge, IL 61325

Grand Ridge over Bills Run - Grundy County
Infrastructure
Conception
$600,000 CJ est. value
Grand Ridge, IL 61325

Resurface Chartres Street
Infrastructure
Bidding
$773,855 CJ est. value
La Salle, IL 61301

Resurface Chartres Street
Infrastructure
Bidding
$773,855 CJ est. value
La Salle, IL 61301

Innovative Solutions and Energy Conservation Measures
Infrastructure, Alteration
Post-Bid
Mendota, IL 61342

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Realign and Reconstruct the Intersection of Commercial Street, Broadway Street, and Main Street in Marseilles
Infrastructure
Results
Marseilles, IL

Various Highways throughout District 3
Infrastructure
Results

Etna Road Mixed-Use Building
Renovation, Infrastructure
Conception
$5,000,000 CJ est. value
Ottawa, IL 61350

Cedar Point to Standard Water Main Extension
Infrastructure
Bidding
$400,000 CJ est. value
Cedar Point, IL 61316

Rowe Street and Various
Infrastructure
Post-Bid
$8,351,000 est. value
Sheridan, IL

North Utica Drifts Reclamation Projects
Infrastructure
Results
IL

Asphalt Bids
Infrastructure
Bidding
$60,000 CJ est. value
Mendota, IL 61342

Construction of Three Hot Mix Asphalt Pavement Pads
Infrastructure
Post-Bid
$311,000 CJ est. value
Streator, IL 61364

RR-21-4821 Pavement Repairs
Infrastructure
Results

Last Updated 03/09/2023 05:34 PM
Project Title

Walnut Street Parking Lot

Physical Address View project details and contacts
City, State (County) Oglesby, IL 61348   (La Salle County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $149,740 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing labor, materials, and equipment to prepare the subgrade and construct concrete curb and gutter, concrete curb, concrete sidewalk, Hot-mix asphalt pavement (or concrete pavement option), and paint pavement marking to construct a parking lot at 238 Walnut Street in Oglesby, IL. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The Work will be substantially completed on or before May26, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before June 1, 2023. BID RESULT HOT MIX ASPHALT - Universal Asphalt & Excavating - $59,870 CONCRETE - Universal Asphalt & Excavating - $89,870

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents