Similar Projects
Lighting Improvements Boiler and Sludge dewatering Areas at Plant No 1
Term Contract
Post-Bid
$85,000 est. value
CA

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Senior Center Generator
Term Contract
Results
$170,000 est. value
Brea, CA 92821

Underground District No.67 Sycamore Street
Alteration
Results
$11,000,000 est. value
Anaheim, CA

Arc Flash Analysis and Electrical Safety Program Development
Alteration
Post-Bid
Santa Ana, CA

Electrical Materials Pad Mounted Switches
Alteration
Results
Anaheim, CA

Purchase Three - Phase Power Transformer With Load Tap Changer
Alteration
Post-Bid
Anaheim, CA

City Hall New Lighting
Term Contract
Results
Stanton, CA

Job Order Contract (JOC) for Low Voltage Systems, Locks and Security Services
Alteration
Post-Bid
Tustin, CA

Installation of a Pole-Mounted Electronic Marquee
Term Contract
Results
$223,000 est. value
Anaheim, CA 92805

Job Order Contract (JOC) for Electrical Services
Alteration
Post-Bid
Tustin, CA

Orange Avenue and Crest Avenue Street Light Modification Project
Infrastructure
Results
$696,776 CJ est. value
Huntington Beach, CA 92648

Electrical Repair and Maintenance Services
Alteration
Post-Bid
Orange, CA

Installation of 12Kv Electrical Switchgear Equipment at the Santa Ana Bus Base
Term Contract
Results
$475,000 est. value
Santa Ana, CA 92704

On-Call Electrical Maintenance and Repair Services
Alteration
Post-Bid
Newport Beach, CA

Last Updated 07/25/2023 10:55 AM
Project Title

Regional Traffic Signal Synchronization Program

Physical Address View project details and contacts
City, State (County) Huntington Beach, CA 92648   (Orange County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Huntington Beach, in conjunction with the Cities of Garden Grove and Westminster, is requesting proposals to develop traffic engineering design, traffic signal operations, traffic signal timing and coordination, construction management, inspection services, and grant funding for the Valley View Street / Bolsa Chica Street corridor. This project includes synchronization of twenty-two (22) traffic signals within the Cities of Huntington Beach, Westminster, and Garden Grove along Valley View Street / Bolsa Chica Street. The project limits are Bolsa Chica Street/Warner Avenue in the City of Huntington Beach to Valley View Street/Chapman Avenue in the City of Garden Grove. The project segment is approximately 6 miles long and includes eight (8) signals maintained by the City of Huntington Beach, six (6) signals maintained by the City of Westminster, five (5) signals maintained by the City of Garden Grove, and three (3) signals maintained by Caltrans. The complete list of intersections, can be found in the application and a project location map for this corridor is included as Exhibit A. This project is funded in part by the Orange County Transportation Authority (OCTA) Project P Regional Traffic Signal Synchronization Project grant funds. The City of Huntington Beach will be the lead agency (agency and City will be used interchangeably) and responsible to optimize signal synchronization timing along the Valley View Street / Bolsa Chica Street Corridor. Online Q&A Yes The project length is approximately 6.0 miles and includes 22 signalized intersections, starting from Chapman Ave in Garden Grove to Warner Ave in Huntington Beach (Exhibit A). The participating agencies are the Cities of Garden Grove, Westminster, and Huntington Beach. Caltrans is not a participating agency however preparing timing for SR-22 ramp, Garden Grove Blvd, and Tiffany Ave. signals on Valley View Street is a component of the project. Timing implementation at the Caltrans signals will be Caltrans responsibility and there are no improvements proposed or planned for Caltrans signals. Q&A Deadline 07/07/2023 4:00 PM (PDT)

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents