Similar Projects
Connector St From Hewatt Rd to Britt Dr; Inc Parkwood Rd
Infrastructure
Design
$9,000,000 est. value
Lawrenceville, GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

2021 LMIG Paving Project
Post-Bid
Buford, GA

T32-D1-Pvmt Pres-SR 403/I-85 Gwinnett-109238
Results
GA

LMIG Street Resurfacing
Results
College Park, GA 30337

COL/LMIG
Post-Bid
Lilburn, GA

Collins Industrial Way Roadway Improvement
Results
Lawrenceville, GA 30043

2021 Annual LMIG Resurfacing Project
Infrastructure
Post-Bid
Lawrenceville, GA

Roadway Improvements on Various City Roads
Results
Sugar Hill, GA

Triple Surface Treatment of South Richland Creek Road
Infrastructure
Post-Bid
Sugar Hill, GA 30518

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 1 and 2
Results
Ellenwood, Forest Park, Lawrenceville, Macon, Morrow, Rex, Riverdale, Stockbridge, Union City, Warner Robins, Woodstock, GA 30294

2021 Street Resurfacing
Infrastructure
Post-Bid
Norcross, GA

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Town Center Roadway Improvements
Infrastructure
Post-Bid
Snellville, GA

Resurfacing of County Roads
Results
Buford, Grayson, Lawrenceville, Lilburn, Norcross, GA 30515

Last Updated 06/24/2022 07:37 AM
Project Title

Apartment Drive Reconstruction

Physical Address View project details and contacts
City, State (County) Duluth, GA 30096   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To perform full depth pavement removal, excavation of unsuitable material as needed, replacement, grading, compaction of grade aggregate base course as needed, shoulder stabilization as needed including grassing, and installation or replacement of thermoplastic striping as directed, traffic control, erosion control and dust control on Apartment Drive within the City limits of Duluth

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earth Stripping and Stockpiling.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents