Similar Projects
Applied Underwriters - Phase 2
New Construction
Conception
Omaha, NE

The Intersections Community Center Food Hall & Business Incubator
New Construction
Conception
Omaha, NE 68105

UNMC University of Nebraska Medical Center Administration Building
New Construction
Design
$50,000,000 to $60,000,000 est. value
Omaha, NE 68131

The Apex Business Center
New Construction, Renovation - 570,000 SF
Design
$105,000,000 est. value
Omaha, NE

BROOK PARK PAVING MAINTENANCE 2022
Infrastructure
Bidding
$99,632 CJ est. value
Omaha, NE 68102

72nd and Center Apartments - Omaha
New Construction, Infrastructure
Bidding
$102,000,000 CJ est. value
Omaha, NE 68124

Burger Detour
New Construction, Infrastructure - 2,258 SF
Sub-Bidding
$1,500,000 CJ est. value
Omaha, NE 68022

Douglas County Housing Authority Commercial Office Renovation
Renovation
Post-Bid
Omaha, NE 68134

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Papio Creek Intake Damper Replacement
Infrastructure
Results
$915,000 CJ est. value
Bellevue, NE 68123

Tim Ohrt Park, Access Road, Parking and Site Improvements
Infrastructure
Results
$500,000 est. value
Bennington, NE 68007

Applied Underwriters - Phase 1
New Construction - 250,000 SF
Construction
$10,000,000 CJ est. value
Omaha, NE

Applied Underwriters - Phase 1
New Construction - 250,000 SF
Construction
$10,000,000 CJ est. value
Omaha, NE

Omaha Civic Auditorium Redevelopment
Infrastructure, Renovation
Pending Verification
$102,000,000 CJ est. value
Omaha, NE 68102

Omaha Civic Auditorium Redevelopment
Infrastructure, Renovation
Pending Verification
$102,000,000 CJ est. value
Omaha, NE 68102

Last Updated 09/22/2022 04:17 PM
Project Title

Kiewit Corporation Headquarters / Omaha

Physical Address View project details and contacts
City, State (County) Omaha, NE 68118   (Douglas County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Parking Garage, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected March 2019
Bids Due View project details and contacts
Estimated Value $76,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 1, 2018, final design is underway. The owner will act as the general contractor. A firm construction timeline has not been set, however, construction is anticipated to begin November or December 2018 with completion planned for 2020. As of December 20, 2018, a public hearing was held earlier this month to consider a waiver regarding first floor commercial tenant spaces for this project. Site prep is underway and construction is expected to commence late first quarter 2019.

Details

3 Stories Above Grade, 200,000 SF. Parking Spaces, 650 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents