Similar Projects
Red Bull/Rauch Facility
New Construction - 2,000,000 SF
Conception
$740,000,000 est. value
Concord, NC 28027

Linamar Plant
Addition - 72,000 SF
Design
Arden, NC 28704

American Fuji Seal Inc
New Construction - 260,000 SF
Design
$52,000,000 est. value
Hickory, NC 28601

Triangle Ready Mix Morrisville Plant
New Construction - 29,840 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Morrisville, NC 27560

Rotec at Flint Group
Renovation - 251,684 SF
Post-Bid
Arden, NC 28704

Ashley Furniture Plant 1 Phase 2 Addition
New Construction, Addition - 532,166 SF
Construction
$20,000,000 est. value
Advance, NC 27006

Lithium Hydroxide Expansion
New Construction - 67,607 SF
Construction
$6,000,000 est. value
Bessemer City, NC 28016

Project Real Mixed-Use Development
New Construction
Pending Verification
Apex, NC 27523

Fedex Distribution Facility
New Construction - 259,000 SF
Pending Verification
$10,000,000 CJ est. value
Wilson, NC

Waste-to-Energy Plant
New Construction
Design
Raleigh, NC

Thermo Fisher
Build-Out - 375,000 SF
Post-Bid
Mebane, NC 27302

TE Connectivity Core Manufacturing Upfit
Renovation - 5,400 SF
Construction
$434,000 est. value
Winston-Salem, NC 27101

VinFast
New Construction
Pending Verification
Moncure, NC

Intersect East - Master Plan
New Construction, Renovation
Design
Greenville, NC

Zero Waste Recycling Addition
New Construction - 74,640 SF
Construction
$1,376,100 est. value
Charlotte, NC 28208

Reported 05/13/2022 06:47 PM
Project Title

Greenway Waste Materials Recycling Facility

Physical Address View project details and contacts
City, State (County) Huntersville, NC   (Mecklenburg County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Building in Operation as of third quarter 2021
Bids Due View project details and contacts
Estimated Value $1,910,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Manufacturing/Processing Plant, 1 Story Above Grade, 30,000 SF New Construction, 1.99 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents