Last Updated | 02/20/2024 02:18 PM |
Project Title | I-99 Newry Pulloff to Plank Rd Intchg |
Physical Address | View project details and contacts |
City, State (County) | Juniata Township, PA 16635 (Blair County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected April 2024 |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Project is the Thin Asphalt Overlay and Bridge Preservation on I-99 From Newry Pulloff to Tyrone Interchange in Blair, Logan, Allegheny, Freedom, Greenfield, Antis, and Snyder Townships, and Duncansville, Tyrone, and City of Altoona Borough, Blair County. Also Included in This Contract is Pavement Base Failure Repair, Updating the Existing Guiderail and Signing and Pavement Markings to Meet Current Specifications and Maintaining Existing Drainage. Channel Repair and Slope Pipe South of the Paving Limits Are Included With the Project as Indicated on the Approved Drawings Included in the Bid Package for State Route 0099, Section 021, 022, and 028, in Blair County Blair, Logan, Allegheny, Freedom, Greenfield, Antis, and Snyder Townships, and Duncansville, Tyrone, and City of Altoona Borough From Approximately Newry Pulloff at Segment 0145 Offset 2073 to Approximately Tyrone Interchange at Segment 0474 Offset 0416. Project Cost Range: $20,000,000.00 - $24,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 25.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - I-99 Newry Pulloff to Plank Rd Intchg *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room. |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |