Similar Projects
Exhaust Ventilation System
Results
$25,000 to $100,000 est. value
El Paso, TX 79916

Airwasher Replacement
Post-Bid
El Paso, TX 79906

Evaporative Commercial Single Inlet A/C Unit
Post-Bid
El Paso, TX 79925

Provide And Install New Freezer In Building 1109 On Fort Bliss
Results
$500,000 to $850,000 est. value
TX

HVAC Control Replacement at El Paso Psychiatric Center
Results
$399,700 est. value
El Paso, TX 79905

Westside Annex Welders Exhaust Hood Project
Post-Bid
El Paso, TX 79922

Tippin Elementary Chiller Compressor Replacement
Post-Bid
El Paso, TX 79912

Assorted Equipment Replacement
Results
Less than $250,000 est. value
El Paso, TX 79905

District Wide HVAC System Repair
Post-Bid
El Paso, TX 79925

Douglass Library Air Conditioner Conversion
Post-Bid
El Paso, TX 79905

Hueco Tanks State Park and State Historic Site North and South Residence HVAC Replacement
Results
$55,000 to $85,000 est. value
El Paso, TX 79938

HVAC Equipment-Statewide
Results
Less than $44,107 est. value

HVAC and Mechanical Products
Term Contract
Post-Bid

Refrigeration and Air Conditioning Maintenance and Repair
Post-Bid
Socorro, TX

Coldwell Administration AC Conversion
Post-Bid
El Paso, TX 79903

Last Updated 03/24/2020 09:32 AM
Project Title

Chiller System Backup Pump, Trans Vista Building, El Paso DHQ

Physical Address View project details and contacts
City, State (County) El Paso, TX 79928   (El Paso County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $32,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site No: 249674 Building No: 248028 1. Install an owner furnished back up pump to match the existing in size and type. 2. Make all piping and electrical connections shown or not to ensure a complete and operational system. 3. Provide and install a manual transfer switch as shown to connect both pumps to the existing automatic starter. 4. Pressure test the system at 150 PSI for 2 hours minimum with zero pressure loss. 5. Connect new equipment with mild steel schedule 40 pipe, welded flanged connections; or type K rigid copper pipe w/ 15% silver solder as specified. 6. Perform a capacity test of the pump using pressure differential readings to plot the actual performance of the pump against the manufactures pump curve. Provide information to owner. 7. Make all electrical connections as per NEC for high and low voltage. 8. Run equipment and record amp draw / voltage to ensure they do not exceed electrical ratings of motor or devices. 9. Clean area and leave in original conditions and fully operational.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents