Similar Projects
Arby's Remodel / Fairview Heights
Renovation
Conception
$500,000 est. value
Fairview Heights, IL 62208

Sephora
Renovation - 2,500 SF
Design
Fairview Heights, IL 62208

Ulta Beauty at Target #2414
Renovation - 1,000 SF
Design
Fairview Heights, IL 62208

Public Safety Building at Emerson Park Metro Station
New Construction, Infrastructure - 16,113 SF
Bidding
$15,000,000 CJ est. value
East Saint Louis, IL 62201

Market Place Streetscape - Phase 2 Roundabout Landscape and Lighting
Infrastructure
Bidding
$4,793,000 CJ est. value
Fairview Heights, IL 62208

New Storage Building
New Construction, Infrastructure
Sub-Bidding
$300,000 CJ est. value
O Fallon, IL 62269

Aggregate
Post-Bid
Freeburg, IL

Roadway Chip Seal
Alteration
Post-Bid
Belleville, IL

Millstadt - PY 2019 CDBG - Laurel Street Improvements - 600 and 700 Block - Phase 1
Results
Less than $95,000 est. value
Millstadt, IL

Building Demolition and Site Work - AMP 3
Demolition
Results
Centreville, IL

Strip Mall Mix Use Buildings
Renovation - 15,120 SF
Construction
Fairview Heights, O'Fallon, IL 62269

Strip Mall Mix Use Buildings
Renovation - 15,120 SF
Construction
Fairview Heights, O'Fallon, IL 62269

Eckerts Farm Expansion
New Construction
Pending Verification
Belleville, IL

Scooter's Coffee
New Construction - 627 SF
Pending Verification
Less than $500,000 CJ est. value
Mascoutah, IL 62258

Walmart Supercenter #201-242 - Smart Bundle
Renovation - 203,748 SF
Design
Belleville, IL 62221

Last Updated 09/12/2022 01:36 PM
Project Title

Central Park - Lot 2

Physical Address View project details and contacts
City, State (County) O Fallon, IL 62269   (Saint Clair County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Retail, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the phased construction of a mixed-use development: Lot 1 will consist of four three-story apartment buildings with 26 units each Lot 2 will consist of commercial, possible restaurant space, with one drive-thru and others with alcohol sales, plus retail, or an entertainment destination Lot 3 will consist of a four-story, 94-room hotel Lot 4 will consist of a four-story apartment building with 240 units As of September 12, 2022, architectural plans are being finalized. An architect and general contractor have been selected. Information regarding subcontractor bidding opportunities has not been released. Dirt work will commence in fall 2022. Although a firm timeline for construction has not been solidified, Lot 1 is expected to begin construction in March or April 2023.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents