Similar Projects
West Carroll Avenue Mixed use
New Construction
Conception
Chicago, IL 60607

Bronzeville Lakefront - Phase II
New Construction - 6,700,000 SF
Conception
$3,000,000,000 to $4,000,000,000 est. value
Chicago, IL

Maintenance Offices Construction
Design
$500,000 to $1,000,000 est. value
Rock Island, IL 61299

Compass Global Logistics Hub
New Construction
Design
$1,700,000,000 est. value
Joliet, IL 60436

HVAC Services
Term Contract, Alteration
Bidding
Collinsville, IL

Architectural/Engineering Services for Carbondale Office and Maintenance Facility
New Construction
Bidding
Carbondale, IL 62901

Addison Office Remodel and Addition
Renovation, Addition - 11,792 SF
Post-Bid
Addison, IL 60101

Kluber Architects Benton Street Office Build Out
Build-Out
Post-Bid
Aurora, IL 60506

183 CES Repair Wing HQ Stage & PA
Results
$25,000 to $100,000 est. value
Springfield, IL 62707

2-Story Office Building With Basement Renovation
Renovation
Results
Chicago Heights, IL 60411

900 West Fulton Mixed Use Development
New Construction, Renovation - 90,000 SF
Construction
Chicago, IL 60607

Metra HQ Tenth Floor Remodeling
Renovation
Construction
$3,361,906 est. value
Chicago, IL 60661

The Point at Six Corners
New Construction - 66,800 SF
Pending Verification
$130,000,000 est. value
Chicago, IL 60611

Mixed-Use Building
New Construction - 47,000 SF
Pending Verification
Chicago, IL 60642

330 North Clark Office Tower
New Construction
Conception
Chicago, IL

Reported 06/17/2021 12:00 AM
Project Title

Administrative Building Rehabilitation

Physical Address View project details and contacts
City, State (County) Wheaton, IL 60187   (DuPage County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Build out & installation of two-story ADA accessible elevator, removal & relocation of a second floor bathroom & install new ADA compliant bathroom, expand & configure a current inside second floor office into three separate offices.

Details

Office, 2 Stories Above Grade, 5,800 SF Renovation.
Division 01 - General Requirements, Interiors Performance Requirements, Interior Finishes Performance Requirements, Commissioning, Interiors Commissioning, Interior Finishes Commissioning.
Division 06 - Wood, Plastics, and Composites, Millwork, Standard Pattern Wood Trim.
Division 07 - Thermal and Moisture Protection, Exterior Insulation and Finish Systems, Flashing and Sheet Metal.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting.
Division 14 - Conveying Equipment, Elevators.
Division 22 - Plumbing, Commercial Plumbing Fixtures, Commercial Water Closets, Urinals, and Bidets, Commercial Lavatories and Sinks.
Division 41 - Material Processing and Handling Equipment, Assembly and Testing Equipment, Applicators, Adhesive Applicators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents