Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Milwaukee County Grounds Floodwall Repair
Infrastructure
Bidding
Milwaukee, WI

Health and Human Services Building - 2021 Site Improvements
Infrastructure
Bidding
Dodgeville, WI 53533

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Concrete Culverts
Post-Bid
WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Pond and Drainage System Construction
Post-Bid
De Pere, WI

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

2021 Culvert Pipes
Post-Bid
WI

Shoreline Stabilization
Results
Oconomowoc, WI 53066

Last Updated 10/05/2021 07:59 AM
Project Title

Kenosha Harbor Breakwater Repair

Physical Address View project details and contacts
City, State (County) Kenosha, WI 53140   (Kenosha County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The project project will consist of repairing the existing Breakwater to maintain safe passage for vessels entering and exiting the harbor. Repairs will restore the structure to original design function within the existing structure footprint. Repair work would consist of removing the existing concrete cap and crushing the deteriorated timber substructure to allow for the placement of new armor stone and resetting existing armor stone as needed. Repairs would likely be conducted by a barge-mounted crane, small operating equipment (front end loader, skid-steer, etc.) barges carrying rock, tugboats, and support vessels. Construction may occur from Lake Michigan or land based equipment. This project is located in Kenosha WI.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Breakwaters, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents