Similar Projects
Reclaimed Water Transmission Main Caloosahatchee River Crossing
Infrastructure
Bidding
Cape Coral, FL 33990

Hickory Head Valves and Actuators
Infrastructure
Bidding
The Villages, FL 32159

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Construction Services for Project Improvements (Phase 1)
Post-Bid
Lakeland, FL 33801

FFY2018 CDBG Neighborhood Revitalization Project
Results
Less than $700,000 est. value
Milton, FL

Lake Frances Estates Water and Wastewater System Improvements
Results
Less than $6,718,402 est. value
Tavares, FL

Honey Hill Watermain System Rehabilitation (WATR2010)
Infrastructure
Bidding
North Miami Beach, FL

Water and Sewer Stock Water Meters Annual Supply Contract
Term Contract
Post-Bid
Vero Beach, FL 32961

City of Auburndale/Florida Polytechnic Reuse System and City of Auburndale/City of Lakeland Potable Water System Interconnection
Results
Auburndale, FL 33823

Hiawassee Road Force Main Replacement at SR 408
Infrastructure
Bidding
$1,342,842 est. value
Orlando, FL 32835

Testing, Maintenance and Certification of Backflow Preventers
Post-Bid
Miami, FL 33010

Wauchula Hills Phase 6 Water and Sanitary Improvements
Results
$1,826,130 est. value
Wauchula, FL 33873

Procurement of New Flow Meters for Water Plant
Infrastructure
Bidding
Coral Springs, FL

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Rich Street to Donovan Street Water Main Project
Results
Less than $450,000 est. value
Lecanto, FL 34461

Last Updated 07/02/2021 07:28 AM
Project Title

Fire and Water Main Expansion, Orange Park Campus

Physical Address View project details and contacts
City, State (County) Orange Park, FL 32065   (Clay County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This scope of work requires relocating existing potable water and fire main service at the Thrasher Horne Performing Arts Center to a new location on the north side of the campus perimeter roadway. SJR State College Civil Engineer and Clay County Utility Authority Engineers have designed and approved the proposed design changes to include installation of a new 8 inch back-flow preventer (Fire Main) and 4 inch back-flow preventer (potable water) plus new potable water meter box, meter and associated under-ground piping.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents