Last Updated | 05/12/2023 10:39 AM |
Project Title | Site and Building Construction Phase 2 at Olana State Historic Site |
Physical Address | View project details and contacts |
City, State (County) | Hudson, NY 12534 (Columbia County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Museum, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $12,900,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project has been awarded but award amount not confirmed. Estimated Budget: $9,500,000 to $12,500,000 Project generally consists of the following elements: (Bidders are responsible for reviewing the entire Drawing set and Project Manual to gain a complete understanding of the project scope) 1. Mobilization 2. Installation of Erosion and Sediment Control Measures 3. Installation of Temporary Controls 4. Installation Maintenance and Protection of Traffic Control Devices 5. Site Clearing and Grubbing and Earthwork / Rock Removal/Blasting 6. Construction of the New Frederic Church Center, of concrete, wood (including the use of mass timber), steel and glass construction. New facility to include the following programmatic elements: information desk, multi-purpose space, cafe area, restrooms, circulation, and support spaces including storage and mechanical. All exhibits shall be procured and installed under a separate contract. Extensive coordination with these separate contracts will be required by the contractor under the direction of the Construction Manager as assigned to the Project by NYS OPRHP. 7. Construction of associated mechanical, electrical, plumbing systems, fire alarm, security system, IT and telecommunications wiring and equipment installation throughout the entire building. 8. Construction of associated site utilities infrastructure, including subsurface septic disposal system, water well and associated treatment system, site electrical, storm drainage, and conduit runs for telecom and IT services. 9. Installation of extensive landscape plantings and furnishings and exterior hardscape. Including site entrance work adjacent to the Route 9G Entrance. 10. Sitewide wayfinding signage system (extending beyond the immediate bounds of the Frederic project site) 11. Construction will be subject to a SWPPP plan and associated measures. 12. Final project cleaning and disposal 13. Demobilization 14. Closeout Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 11% Service-Disabled Veteran-Owned Business Contracting Goal: 4% Contract term: 517 days after agreement has been approved by NYS Comptroller's County(ies): All NYS counties Location: Olana State Historic Site Frederic Church Visitor Center Business entities awarded an identical or substantially similar procurement contract within the past five years: n/a *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 11/23/2022 at 1:00 PM ET RFIs received after this due date and time will not be processed. RFI's shall be submittedto:Stephen.McCorkell@parks.ny.gov |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |