Similar Projects
Donora Sewer Rehabilitation Project
Post-Bid
Donora, PA 15033

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III
Post-Bid
Johnstown, PA 15901

Twin Oaks Storm Sewer Piping Project
Results
Gettysburg, PA

Water Street Waterline Replacement Project
Results
Linesville, PA

Whitebirch Road Extension
New Construction
Construction
Hazle Township, PA 18201

Water Valve Replacements Phase 4
Post-Bid
Tarentum, PA 15084

2019 Blairsville Highway Turn Back Project Old Main Street and South Liberty Street
Results
Blairsville, PA

Ductile Iron Pipe
Term Contract
Post-Bid
Erie, PA 16507

Sr 208 Additional Force Main
Results
Mercer, PA

Polyethylene Pipe
Post-Bid
Greensburg, PA 15601

Backwater Valve Maintenance Contract
Results
Pittsburgh, PA

Cast Iron Frames and Grates
Post-Bid
Greensburg, PA 15601

Sanitary Sewer Manhole Rehabilitation Contract
Results
Less than $931,000 est. value
Pittsburgh, PA

Copper Pipe
Post-Bid
New Stanton, PA 15672

Sanitary and Storm Water Cipp Project
Results
Lock Haven, PA 17745

Last Updated 01/29/2021 04:00 PM
Project Title

Cured-In-Place-Piping for Degraded Storm Drain Pipes

Physical Address View project details and contacts
City, State (County) Bloomsburg, PA   (Columbia County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Base Bid 1 (Area 1) - Reline storm drain pipe. B. Area 2A & 2B (Option 1) - Reline storm drain pipe. C. Area 3 (Option 2) – Reline storm drain pipe. D. Installation of CIPP shall conform to either the requirements of ASTM F1216 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube or ASTM F1743 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-In-Place Installation of Cured-In-Place Thermosetting Resin Pipe.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents