Similar Projects
Install Fixed Emergency Generators AT FPC Bryan
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Bryan, TX 77803

Replace Switchgear
Renovation
Post-Bid
$700,000 CJ est. value
College Station, TX 77840

Underground Cable Replacement Project
Alteration
Post-Bid
Bryan, TX

Northgate Underground Conduit & Manhole Installation
Infrastructure, Alteration
Results
College Station, TX 77842

Luedecke Install Utilities for Sever Racks
Renovation
Results
$231,745 CJ est. value
College Station, TX 77840

Distribution Pole Reinforcement 2022
Alteration
Post-Bid
Bryan, TX

Electrical Repair and Maintenance Services
Alteration
Post-Bid
Austin, Bryan, Burnet, Cedar Park, Fredericksburg, Georgetown, Lincoln, Llano, Lockhart, Mason, San Marcos, Taylor, TX 77808

Overhead Line Maintenance and Repair
Alteration
Post-Bid
College Station, TX

Annual Price Agreement for Di-Electric Switchgears
Alteration
Post-Bid
College Station, TX

Water Wells 6, 11 and 19 Electrical Improvements
Infrastructure, Alteration
Post-Bid
$750,000 est. value
Bryan, TX

Electronic Components Power Tubes
Term Contract
Post-Bid
College Station, TX 77840

Blanket Agreement for Utility Poles - Rebid
Term Contract
Post-Bid
College Station, TX 77840

Annual Service Agreement for Repair and Rebuild of City Owned Transformers
Term Contract
Post-Bid
College Station, TX 77840

Wickson Creek Special Utility District Well 8 Electrical
Renovation
Post-Bid
$142,000 CJ est. value
Bryan, TX 77803

Purchase of 3 Phase Transformers
Term Contract
Post-Bid
College Station, TX 77840

Last Updated 08/17/2023 09:59 AM
Project Title

BTU Wellborn Transformer Addition Project

Physical Address View project details and contacts
City, State (County) Bryan, TX 77803   (Brazos County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes but is not limited to civil work with the addition of a new 138kV breaker, switches, 33MVA power transformer, 12.5kV breakers and protection/control work with the addition of new cable, relay panels, testing and commissioning. Construction details such as foundations, grounding, etc., can be found in drawings package. Drawings are broken into 2 sets: 1 structural & engineering set and 1 protection & control set. Both sets include removal and addition drawings to aid with construction. Question Deadline: 08/14/2023 at 5:00 PM CT Estimated start date is September 2023 with an expected completion on March 2024. A contingency amount of 20% shall be included in this project. If the bid proposal amount plus contingency amount exceeds the value that requires a bid bond to be submitted, the 20% contingency amount shall be included in the bid bond. The right to accept any bid or to reject any or all bids and to waive all formalities is hereby reserved by Bryan Texas Utilities.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents