Similar Projects
Furnace and A/C units (2 Locations)
Renovation
Design
Lynnville, IN 47619

Crane B41 HVAC
Renovation
Design
$10,000,000 CJ est. value
Bloomfield, IN 47424

South Dearborn Community School Corporation (CSC) Renovations
Renovation
Bidding
$500,000 CJ est. value
Aurora, IN 47001

South Dearborn Community School Corporation (CSC) Renovations
Renovation
Bidding
$500,000 CJ est. value
Aurora, IN 47001

Tippecanoe School Corporation District Video Security Upgrades
Renovation
Sub-Bidding
$100,000 CJ est. value
Lafayette, IN 47904

Tippecanoe School Corporation District Video Security Upgrades
Renovation
Sub-Bidding
$100,000 CJ est. value
Lafayette, IN 47904

Homestead High School Phase 2B
Renovation, Addition
Post-Bid
Fort Wayne, IN 46814

Performance Contract for Energy Conservation and Facility Improvements
Post-Bid
Francesville, IN

IN031 Coleman Hall Replace HVAC Boxes and Controls
Results
Indianapolis, IN 46202

Ivy Hall Chiller Replacement
Results
Less than $700,000 est. value
Lafayette, IN 47905

Community and Education Center and Hilltop PK and Preschool
Renovation, Addition - 68,050 SF
Construction
Less than $19,398,000 est. value
Indianapolis, IN 46200

Cardinal Ritter High School
Renovation, Addition - 3,675 SF
Construction
Indianapolis, IN 46222

Warsaw Community High School & Warsaw Area Career Center
New Construction
Pending Verification
$28,948,675 to $30,251,675 est. value
Warsaw, IN

Randolph Southern Schools New Student Activity Center
New Construction, Infrastructure - 7,350 SF
Bidding
$2,324,000 CJ est. value
Lynn, IN 47355

HVAC Equipment for Critchfield Elementary School
Term Contract
Sub-Bidding
La Porte, IN 46350

Last Updated 08/12/2022 12:10 PM
Project Title

Mitchell Community Schools HVAC Renovations

Physical Address View project details and contacts
City, State (County) Mitchell, IN 47446   (Lawrence County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, HVAC, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $864,712 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each proposal must be accompanied by a certified check made payable to Mitchell Community Schools in an amount equal to not less than five percent (5%) of the base bid or an acceptable bidder's surety bond made payable to Mitchell Community Schools, in a SPECIFIC AMOUNT of not less than five percent (5%) of the base bid, executed by a surety company authorized to do business in the State of Indiana. The certified check or bidder's bond shall be a guarantee that said bidder will, if the contract is awarded to him, execute within ten (10) days from the acceptance of his proposal a contract for the work bid upon, and furnish acceptable surety bonds as set forth in the specifications. However, if the contractor has not executed the contract within the ten (10) day period or has failed to furnish acceptable surety bonds as indicated, the Owner reserves the right to award the contract to the most responsive and responsible bidder, and the bid security will be forfeited. Bid Forms shall be properly and completely submitted on Contractor's Bid for Public Bidding Form No. 96 as prescribed by the State Board of Accounts for the State of Indiana, in addition to the Bid Form included in these specifications. No bidder may withdraw his bid for a period of ninety (90) days after the date set for the opening of bids. A Financial Statement is a required attachment to Form 96. Check each project's manual for specific qualifications and forms to include in the bid package. Owner reserves the right to reject any or all bids and to waive any defects or irregularities if deemed to be for the best interest of the Corporation.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents