Similar Projects
Intersection Improvement US 176 (State Rd)/S-135 (Mudville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Ridgeville, SC 29472

Section/corridor Improvements - S-29 - Eagle Rd (S-251) to S-585 (Near Garwood Rd)
Infrastructure
Conception
$2,500,000 CJ est. value
Moncks Corner, SC 29461

Baker Motors - Alfa Romeo, Maserati and Rolls Royce Dealership
Demolition, New Construction, Infrastructure - 11,240 SF
Design
$5,000,000 CJ est. value
Charleston, SC 29407

O'Quinn School Addition
Addition, Demolition, Infrastructure - 21,000 SF
Design
$4,500,000 CJ est. value
Charleston, SC 29412

Department of Public Works Parking Lot Resurfacing
Infrastructure
Bidding
$400,000 CJ est. value
Goose Creek, SC 29445

Design, Provide, and Install Metal Canopies
Infrastructure, Renovation
Bidding
$45,000 CJ est. value
Moncks Corner, SC 29461

RSFH Berkeley Campus Expansion, SD Outreach
Addition, Demolition, Build-out, Renovation, Infrastructure - 338,300 SF
Sub-Bidding
$40,000,000 CJ est. value
Summerville, SC 29486

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

AutoZone #5529 / Summerville
New Construction, Infrastructure - 7,147 SF
Post-Bid
$1,500,000 CJ est. value
Summerville, SC 29486

Pole Mounted Sewer Storm Drain Inspection Camera System
Results
Summerville, SC

Red Bank Road Gravity Upgrade
Infrastructure
Results
$8,360,301 est. value
SC

St. Andrews Mixed Use Development
New Construction, Infrastructure - 11,400 SF
Pending Verification
$25,000,000 CJ est. value
Charleston, SC 29407

Woodfield II at Pointhope
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Charleston, SC 29492

Sportsman Island Boat & RV Storage Facility
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Charleston, SC 29492

Marshes at Daniel Island
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Charleston, SC 29492

Last Updated 10/11/2022 01:38 PM
Project Title

Proposed Mitigation Plans for SC-91 (Berlin Myers Parkway) Phase 3

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Request for Qualifications, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Summerville is soliciting statements of qualifications from CONTRACTORS interested in providing construction services. The Town is working with the South Carolina Department of Transportation to select prequalified contractors to for the floodplain mitigation work for the Berlin Myers Parkway, Phase 3 project. The project involves grading of Sawmill Branch Canal stream banks, reconstruction of multi-use path and erosion control related items from SC-642 to S-18-678, the approximate length of 2.6 miles.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents