Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Locust Street CSO Elimination and Water Main Replacement - Phase 4+5 Construction - City of Bloomington
Infrastructure
Design
$2,190,000 est. value
Bloomington, IL 61701

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

Building Addition for Lexington Community Fire Protection District
Addition, Demolition, Infrastructure
Bidding
$1,600,200 CJ est. value
Lexington, IL 61753

Resurfacing (3P) Standard Overlay
Infrastructure
Bidding
$2,000,000 CJ est. value
Bloomington, IL 61705

Interstate Smart Overlay on I-74
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Bloomington, IL 61704

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

110,000 Gallon Standpipe Rehabilitation
Infrastructure
Post-Bid
$500,000 CJ est. value
Arrowsmith, IL 61722

Sugar Creek Force Main Improvements
Infrastructure
Results
Bloomington, IL

Locust Street CSO Elimination and Water Main Replacement Phase III
Infrastructure
Results
Bloomington, IL 61701

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

The Trails at Sunset Lake
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Normal, IL 61761

Resurfacing, Base Course Widening, Concrete Curb and Gutter and Rumble Strips on CH 18
Infrastructure
Bidding
$600,000 CJ est. value
Dale Township, IL 61705

Last Updated 04/19/2023 07:07 PM
Project Title

Water Meter Replacement

Physical Address View project details and contacts
City, State (County) Le Roy, IL 61752   (McLean County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $116,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project herein specified and described includes the following work: Water meter replacement at various locations throughout the City of Le Roy. The Engineer's Estimate of Cost shall not be released in advance of the scheduled time and date of the bid opening. 4. All proposals must be accompanied by a BANK DRAFT, CASHIER'S CHECK, OR CERTIFIED CHECK made payable to City of Le Roy, in the amount of five percent (5%) of the bid, or BID BOND in the same amount. 5. Contractor and subcontractors shall not pay less than the prevailing wage rate as determined by the Illinois Department of Labor to all laborers, workmen and mechanics performing under the contract, and shall comply with the requirements of the Illinois Prevailing Wage Act (820 ILCS130/1-12). 6. Before the Contractor and any Subcontractor commences work, the Contractor and any Subcontractor shall have in place a written Substance Abuse Prevention Program for the prevention of substance abuse among its employees which meets or exceeds the requirements in P. A. 95-0635 or shall have a collective bargaining agreement in effect dealing with the subject matter of P. A. 95 0635. 7. Bids will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. The owner reserves the right to waive any informality in the bids received, to determine the lowest responsible bidder or reject any or all bids. 9. Special attention shall be given to the construction schedule listed in the Special Provisions. REJECTION OF BIDS: The City of Le Roy reserves the right to accept, negotiate, or reject any or all proposals and to waive any variance from the requirements of the instructions for bidders. At the discretion of the City, required items may be submitted after the bid opening if there is sufficient compliance with instructions at the time of the bid opening to permit the City to determine the price bid.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents