Similar Projects
Annual Contract for Sewer Clean-Out
Term Contract
Post-Bid
Salt Lake City, UT

Combination Sewer Cleaner
Term Contract
Post-Bid
Salt Lake City, UT

10600 South Water Transmission Line and Harrison Street Storm Drain and Waterline Projects
Results
Sandy, UT

S Lone Peak Pkwy Storm Drain Project
Results
Less than $249,968 est. value
Draper, UT 84020

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

Rush Trail Extension Phase 2
Results
Less than $50,000 est. value
Draper, UT

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

Construction Bates Central Kitchen, Site Drainage and Grading
Results
West Valley City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

H--Storm Drain Cleaning - Salt Lake City VAMC - Base + 4
Results
Salt Lake City, UT 84148

Crown Street Storm Drain Improvement Project
Post-Bid
Taylorsville, UT 84129

Derby Street Storm Drain
Results
Less than $432,565 est. value
West Valley City, UT

Lone Peak Elementary Storm Drain Upgrade
Post-Bid
Sandy, UT 84092

Utahna Drive Storm Drain Project
Results
Murray, UT

2019 Midvale Storm Drain Project
Results
$200,000 to $300,000 est. value
Midvale, UT

Last Updated 03/08/2019 09:49 PM
Project Title

Foothills Park Storm Drain Project

Physical Address View project details and contacts
City, State (County) Riverton, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Scope of Work: 12" RCP Pipe and 3x3 solid wall box and deck for the Foothills Park Storm Drain Project. 12" RCP Pipe. 3x3 solid wall box and deck, to include the following: Self Cleaning box where the FL of pipe and box are the same. FL of box to finish grade is 3'. Deck receives APWA 302.1 ring and lid. Deck is 12" below finish grade. Flow through box with 30" openings. Provide detail.
Details
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents