Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Architect-Engineer Environmental Services
Renovation, Term Contract
Bidding
$100,000 to $1,000,000 est. value

Architectural Services - Term Contract
Renovation, Term Contract
Bidding

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Rehabilitate Office Buildings - Architectural/Engineering Services
Renovation, Term Contract
Bidding

Construction Inspection IDIQ (MATOC)
Post-Bid
Less than $100,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Region 9 Architect And Engineer Short Selection List
New Construction, Term Contract
Bidding
Milwaukee, WI

Geotechnical A-E IDIQ
Post-Bid
Less than $4,000,000 est. value

Architect-Engineer Services for Multiple-Award Indefinite Delivery Indefinite Quantity Contracts
Results
$8,000,000 est. value

2020 Architect and Engineering IDIQ
Post-Bid
$5,000 to $75,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Reported 02/10/2022 12:00 AM
Project Title

Consultant Services - RRAMP LAB - SHTM Prichard Gym

Physical Address View project details and contacts
City, State (County) Stony Brook, NY 11790   (Suffolk County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide design, bid documents, and construction administration services for the conversion/renovation of existing Racquetball/Squash Courts into a Rehabilitation Research and Movement Performance (RRAMP) Laboratory for the School of Health Technology and Management (SHTM).

Details

Architectural, 7,894 SF New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents