Last Updated | 03/31/2023 11:21 AM |
Project Title | Supervisory Control and Data Acquisition (SCADA) System Replacement and Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Woodbury, NJ 08096 (Gloucester County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $311,850 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed work shall be completed within 60 calendar days from the Notice to Proceed date, and includes the following major items: Design, fabricate & install up to 14 SCADA Controller Assemblies at various water and sewer facilities Install SCADA PC and system software Install Cellular Communications Network System Start-up & Training. Each proposal bid must be accompanied by: a Proposal (Bid) Bond or Certified Check for not less than ten percent (10%) of the amount of the bid, of which, the amount of the bond or certified check need not exceed $20,000, made payable to the City of Woodbury. Bidders, prime and sub-contractors, are required to comply with the following: a. N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 (Affirmative Action); b. P.L. 1963 C150 (New Jersey Prevailing Wage Act); c. Americans with Disabilities Act of 1990 (42 U.S.C. 12101, et seq.); d. P.L. 1977, c. 33, a Disclosure Statement listing Stockholders is required; e. P.L. 1999, c. 238, a Public Works Contractor Registration Act certification is required; f. P.L. 2004, c. 57, a New Jersey Business Registration Certificate is required; g. N.J.S.A. 40A:11-1, et seq. (New Jersey Public Contracts Law) All blank spaces in the proposal, except as otherwise noted, must be filled in; and no change shall be made in the phraseology of the proposals or of the item mentioned. All information that may be requested of the bidder in these specifications shall be included with this proposal. All erasures, interpolations, or other physical changes on the bid form shall be initialed or signed by the bidder. The successful bidder will be required to furnish, within ten (10) days after the award, a Surety Corporation Performance Bond or Letter of Credit equal to one hundred percent (100%) of the contract price AND a separate Payment Bond or Letter of Credit equal to one hundred percent (100%) of the contract price. All applicable surety bonds or LOC required must be written by a surety company listed on the Federal Treasury List (Department Circular 570-Surety Companies Acceptable on Federal Bonds) and such surety company must be acceptable to the City Solicitor and authorized to do business in the State of New Jersey. Bids must be prepared on the standard proposal forms provided, in the manner designated therein. Each bid must be enclosed in a sealed envelope, bearing the name and address of the bidder, and labeled SCADA SYSTEM REPLACEMENT & UPGRADES PROJECT and shall be addressed to the Clerk, City of Woodbury. The cutoff date for receipt of written inquiries is Tuesday January 24, 2023 at 11 a.m. The system will be one that is offered as standard by a manufacturer regularly engaged in the manufacture of microprocessor-based distributed process control and data acquisition systems meeting the requirement set forth herein. The Vendor shall have been designing and building such systems for a minimum of five years and have a minimum often systems in service. Furnish all engineering, installation, wiring, labor, instrumentation and control equipment hereinafter specified to perform the intended function. Work shall include programming, services and incidentals required to design, construct and supervise the installation and placement of the control system into satisfactory operation. Include all hardware and software necessary to accomplish the functions described herein. The system components located at the remote facility shall be capable of providing station control and the central facility shall be capable of monitoring and controlling all remote locations listed in this specification as well as future locations |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |