Similar Projects
West Loop Phase II - FP067 - City of Davenport
Infrastructure, Alteration
Conception
$722,938 est. value
Davenport, IA 52801

Tremont Sanitary Interceptor Replacement - 30048 - City Of Davenport
Alteration
Conception
$3,150,000 est. value
Davenport, IA 52803

43rd Street Reconstruction
Infrastructure
Design
$605,625 CJ est. value
Davenport, IA 52806

Main Street Landing - Destination Play Area and Event Lawn
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Davenport, IA 52803

Fairmount Community Center
New Construction, Infrastructure - 30,000 SF
Post-Bid
$2,200,000 CJ est. value
Davenport, IA 52804

Sewer Lateral Program FY22
Infrastructure
Results
Davenport, IA

Auxiliary Site Clearing
Demolition, Alteration
Results
Davenport, IA 52802

Middle Road Pedestrian Bridge - City of Bettendorf
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bettendorf, IA 52722

Townplace Suites by Marriott
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Davenport, IA 52801

Supplemental Community Water Source - Well at Genesis East
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Davenport, IA 52803

Revetment
Infrastructure
Results
IA

Dollar General - Rockingham Road / Davenport
New Construction, Infrastructure - 10,640 SF
Pending Verification
$3,000,000 CJ est. value
Davenport, IA 52802

Emeis Bunkers Renovation Phase 3
Infrastructure
Post-Bid
$50,000 CJ est. value
Davenport, IA 52804

Bicentennial Park Emergency Access
Infrastructure
Results
$110,000 CJ est. value
Riverdale, IA 52722

Kimberly Road Car Wash
New Construction, Infrastructure - 2,176 SF
Pending Verification
$500,000 CJ est. value
Bettendorf, IA 52722

Last Updated 10/12/2022 10:06 AM
Project Title

Park View Stormwater Wetlands

Physical Address View project details and contacts
City, State (County) Eldridge, IA 52748   (Scott County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $345,697 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of the proposed work and award the contract to the lowest responsive responsible bidder or set such subsequent time and place, as determined by the Board, for acting upon the bids and entering into a contract for the work. The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements generally described as follows: Construction of a storm water wetland; site preparation, grading, erosion control and site stabilization, adjustment of existing and installation of new utilities and vegetation planting, establishment and maintenance. All bids shall be made on the forms provided with the specifications, to the Park View Water & Sanitary District, on or before the time specified above. Each bid shall be accompanied by bid security meeting the requirements of the specifications and made payable to the Owner in an amount equal to five percent (5%) of the total amount of the bid. Questions regarding this project may be directed to Anthony Harbaugh at Shive-Hattery, Inc. 4125 Westown Parkway, Suite 100, West Des Moines, IA 50266; email aharbaugh@shive-hattery.com; phone 515.223.8104. The Contractor shall comply with the SRF Required Front-End Specifications, Equal Employment Opportunity requirements of Executive Order 11246, Affirmative Action requirements, MBE/WBE/SBRA requirements, Federal Labor Standards Provisions (including Davis-Bacon prevailing wage rates), and American Iron and Steel requirements as outline in the Contract Documents. The Contractor shall be able to demonstrate a good faith effort was made to utilize MBE/WBE/SBRA businesses in this project. The Park View Water & Sanitary District Board reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents