Similar Projects
Health Department Addition and Alterations
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Martinsburg, WV 25403

Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

Const New/reloc Road - Northern Connector
Infrastructure
Bidding
$8,000,000 CJ est. value
Berkeley Springs, WV 25411

Property Redevelopment - 1601 Washington Street East
Infrastructure
Post-Bid
Charleston, WV 25311

Fairmont Coke Works-Sharon Steel Redevelopment
Infrastructure
Post-Bid
Fairmont, WV

Site Development - Facility Expansion Project
Results
Summit Point, WV

Kanawha Boulevard Street Light Repair Project
Results
Charleston, WV 25300

Pocahontas ADA Ramps + 2
Infrastructure
Design
$451,963 CJ est. value
Marlinton, WV 24954

Excavation Work and Relocation of Water Main
Infrastructure
Post-Bid
Spencer, WV

Milton Interchange Lighting 1
Infrastructure
Results
WV

Parkersburg - Williamstown
Infrastructure
Design
$3,000,000 CJ est. value
Mineral Wells, WV 26150

Sledding Hill Slope Grading and Tow Rope Installation
Infrastructure
Post-Bid
WV

Clarksburg Exp Lighting
Infrastructure
Results
WV

US 219-WV 72 I/C (AC Payback) NSFLTP Grant
Infrastructure
Design
$12,000,000 CJ est. value
Elkins, WV 26241

LAST or LUST Corrective Action and Site Remediation
Infrastructure
Post-Bid
Charleston, WV

Last Updated 10/27/2022 05:03 AM
Project Title

Parkersburg Cbd Tl Ren +29

Physical Address View project details and contacts
City, State (County) Washington, WV 26181   (Wood County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : NHPP0068180D Type of Work : Replace Traffic Signals As of October 27, 2022, the project is in Design status. The funding obligation date for the construction is October 28, 2022. WVDOT - Parkersburg Cbd Tl Ren +29 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents