Last Updated 01/14/2019 07:34 AM
Project Title

480V MCC Installation for the 480V Upgrade Implementation Project

Physical Address View project details and contacts
City, State (County) Lakeland, FL   (Polk County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 480v MCC installation at the mcintosh power plant unit 3 (phase 2 and 3). 480v motor control centers (mcc) have been purchased by owner to replace the mcintosh unit 3 mcc lineups identified as over-dutied. the new 480v mccs match the dimensions, layouts, and wiring of the existing 480v mccs. existing mccs are to be removed, wiring disconnected, and new mccs are to be installed in place using the existing wiring.
Details
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents