Similar Projects
Last Updated | 01/14/2019 07:34 AM |
Project Title | 480V MCC Installation for the 480V Upgrade Implementation Project |
Physical Address | View project details and contacts |
City, State (County) | Lakeland, FL (Polk County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 480v MCC installation at the mcintosh power plant unit 3 (phase 2 and 3). 480v motor control centers (mcc) have been purchased by owner to replace the mcintosh unit 3 mcc lineups identified as over-dutied. the new 480v mccs match the dimensions, layouts, and wiring of the existing 480v mccs. existing mccs are to be removed, wiring disconnected, and new mccs are to be installed in place using the existing wiring. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |