Similar Projects
Twinwood Business Park Building 4
New Construction, Infrastructure - 181,241 SF
Design
$8,875,511 CJ est. value
Brookshire, TX 77423

Twinwood Business Park Building 4
New Construction, Infrastructure - 181,241 SF
Design
$8,875,511 CJ est. value
Brookshire, TX 77423

Construction of Hardscape, Landscape, and Irrigation in Sunterra Stockdick Road
Infrastructure
Bidding
$221,919 CJ est. value
Katy, TX 77493

Construction of Hardscape, Landscape, and Irrigation in Sunterra Stockdick Road
Infrastructure
Bidding
$221,919 CJ est. value
Katy, TX 77493

Clay Road Reconstruction
Post-Bid
$2,600,000 est. value
Houston, TX 77282

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Group Seal Coat Program
Results

Brookshire Force Main (Contract A). Pipe Bursting (Contract B)
Results
$383,140 est. value
Brookshire, TX

Construction of Water, Sanitary, and Drainage Facilities in Sunterra Section 31
Infrastructure
Pending Verification
$890,508 CJ est. value
Hempstead, TX 77445

Construction of Water, Sanitary, and Drainage Facilities in Sunterra Section 31
Infrastructure
Pending Verification
$890,508 CJ est. value
Hempstead, TX 77445

Twinwood Business Park Building 2
New Construction, Infrastructure - 91,288 SF
Design
$4,880,679 CJ est. value
Brookshire, TX 77423

O'Reilly Auto Parts (BKS) / Brookshire
New Construction, Infrastructure - 7,650 SF
Bidding
$1,300,000 CJ est. value
Brookshire, TX 77423

Sunterra Phase 3 Pipeline Removal and Demolition
Infrastructure
Post-Bid
$300,000 est. value
TX

US0290 - Asphalt Pavement Repair
Infrastructure
Results
$417,000 est. value
TX

Tamarron West Rec Center
New Construction, Infrastructure - 11,865 SF
Pending Verification
$2,500,000 CJ est. value
Brookshire, TX 77423

Last Updated 10/11/2022 07:35 AM
Project Title

Bluestem Offsite Utility Extension

Physical Address View project details and contacts
City, State (County) Hempstead, TX 77445   (Waller County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope shall include the installation of approximately 4,790 LF of 8"-12" PVC waterline; 7,890 LF of 8"-10" PVC gravity sanitary sewer; 3,870 LF of 24"-54" RCP storm sewer; 11,040 SY of 6"-7" reinforced concrete pavement. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents