Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

PA 36 to US 22
Infrastructure
Design
$3,940,000 CJ est. value
Hollidaysburg, PA 16648

PA 36 to US 22
Infrastructure
Design
$3,940,000 CJ est. value
Hollidaysburg, PA 16648

Valley View County Park Amphitheater Improvements - General and Electrical
Infrastructure
Bidding
$206,000 CJ est. value
Altoona, PA 16602

Learning Express Parking Lot Upgrade Project
Infrastructure
Bidding
$150,000 CJ est. value
Altoona, PA 16602

2022 CDBG Street Reconstruction Project
Infrastructure
Post-Bid
Altoona, PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Bridge No. 3 Rehabilitation Project
Results
Hollidaysburg, PA

Milling of Bituminous Pavement
Infrastructure
Results
Tyrone, PA

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

I-99 Newry Pulloff to Plank Rd Intchg
Infrastructure
Design
$11,150,000 CJ est. value
Juniata Township, PA 16635

North 7th Avenue and North 11th Street Roadway Reconstruction
Infrastructure
Bidding
$500,000 CJ est. value
Altoona, PA 16601

2022-2023 Road Utility Cut Restoration Project
Infrastructure
Post-Bid
Altoona, PA

County Road 101 Rehabilitation Project
Infrastructure
Results
Hollidaysburg, PA

Last Updated 01/30/2023 03:06 AM
Project Title

Blair Gap Run Bridge

Physical Address View project details and contacts
City, State (County) East Freedom, PA 16637   (Blair County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected February 2025
Bids Due View project details and contacts
Estimated Value $3,942,800 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Dunnings Hwy (SR 3013) over Blair Gap Run near the intesection of US 22 in Allegheny Township, Blair County Primary Improvement Type: Bridge Replacement As of January 30, 2023, the project is Future development stage. Anticipated letting date is December 12, 2024. PennDOT - Blair Gap Run Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents