Similar Projects
Needlepoint Bipolar Ionization
Bidding
Charlotte, NC

PC Air Units
Post-Bid
Charlotte, NC 28208

Replace HVAC Equipment/Systems - Charlotte
Post-Bid
$1,000,000 to $5,000,000 est. value
Charlotte, NC

HVAC Parts and Equipment
Results
Charlotte, NC

Charlotte North Carolina HVAC Replacement
Results
$120,000 to $170,000 est. value
Charlotte, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

HVAC Replacements at Wilson Air North
Post-Bid
Charlotte, NC 28208

CATS North Tryon Underpass and Old Concord Road HVAC Addition for Remote Ethernet Switch Cabinets
Results
Less than $25,000 est. value
Charlotte, NC 28273

Weddington Elementary School's Chiller Replacement
Post-Bid
Matthews, NC 28104

Cats NTUP and OCR P and R HVAC Addition for RES Cabinets
Results
Less than $25,000 est. value
Charlotte, NC 28200

HVAC Preventative Maintenance and Repair Services
Term Contract
Post-Bid
Charlotte, NC 28277

HVAC Replacements at Honeywell Building
Results
Charlotte, NC

Replacement of Seven (7) Roof Top Air-Conditioning Units at JV Washam Elementary School
Post-Bid
Cornelius, NC 28031

Replacement of Unit Ventilators at South Charlotte Middle School
Results
Charlotte, NC 28277

Needle Point Bipolar Ionizers
Post-Bid
Charlotte, NC

Reported 03/31/2021 12:00 AM
Project Title

80 Ton Chiller

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Firm-fixed price contract to replace the chiller at building 76. Project includes, but is not limited to, disconnect all pipes, electrical and Direct Digital Control (DDC) circuits, remove the existing chiller unit and transport to a location approximately 0.5 miles away. The Government will dispose of the chiller. Existing chiller sits behind a 6ft high brick wall in a mechanical yard with the electrical connections immediately adjacent to the chiller. The Contractor shall install a new 80 Ton Chiller, reconnect all electrical and DDC Circuits, connect the new chiller to the existing piping system and ensure compatibility with the existing BACnet Alerton DDC System.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents