Similar Projects
Last Updated | 03/28/2019 05:02 PM |
Project Title | 8800 South Reconstruction Project - Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Sandy, UT (Salt Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency - 09/10/18 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all the labor, materials, tools and equipment, insurance, and bonding necessary, but not limited to completing the Sandy City 8800 S Reconstruction Project Phase 1, located between State Street and 150 East (Center Street). The work includes the removal of existing asphalt and roadway excavation for a new roadway consisting of roadbase and asphalt. Concrete work includes the removal and replacement of curb and gutter, sidewalk, ADA pedestrian ramps, drive approaches, and utility collar adjustments. Also included is pipe work for a new storm drain line and upgrading the existing sewer mainline. | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |