Similar Projects
Reconstruction of Bridge 170 carrying County Road 900 South over Shoemaker/Thomas Ditch
Renovation
Bidding
$910,000 CJ est. value
Bluffton, IN 46714

2023 CCMG R1 Resurfacing & Crack Sealing
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Versailles, IN 47042

Stone Materials
Infrastructure, Alteration
Post-Bid
Schererville, IN

Ivy Tech Community College Indy C4 Exterior Concrete Stair Project
Renovation, Alteration
Post-Bid
$110,000 est. value
Indianapolis, IN 46208

Hudnut Commons Garage Concrete Repairs
Alteration
Results
Indianapolis, IN 46213

Alley Reconstruction - Madison Street, East Jefferson Boulevard, Harmar Street, Division Street
Infrastructure, Alteration
Results
Fort Wayne, IN 46895

Bridge Replacement and Small Structure Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$7,986,732 CJ est. value
Rochester, IN 46975

Alley Reconstruction - Madison Street, East Jefferson Boulevard, Francis Street, Harmar Street
Infrastructure, Alteration
Results
Fort Wayne, IN 46895

Rushville Fire Department Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 5,137 SF
Post-Bid
$1,000,000 CJ est. value
Rushville, IN 46173

Jasper Campus Miscellaneous Concrete Work
Alteration
Results
Jasper, IN 47546

Upgrade Clean Rooms Phase 4
Renovation
Post-Bid
$100,000 CJ est. value
Indianapolis, IN 46202

2022 Miscellaneous Concrete Package
Alteration
Results
Fort Wayne, IN

New Allen County Jail and Sheriffs Office
New Construction, Infrastructure - 400,000 SF
Post-Bid
$350,000,000 CJ est. value
Fort Wayne, IN 46806

Arlington Park Concrete Street Repairs Phase 3
Infrastructure, Alteration
Results
Fort Wayne, IN

Camp Atterbury USPFO Annex A Warehouse
Renovation
Post-Bid
$150,000 CJ est. value
Edinburgh, IN 46124

Last Updated 05/22/2023 06:04 PM
Project Title

New Fortville Elementary School - Early Release - BP 1,2,3 and 4

Physical Address View project details and contacts
City, State (County) Fortville, IN 46140   (Hancock County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Owner reserves the right to accept or reject any bid or waive any informality or error in bidding for a period of 60 days from bid opening date. The Construction Manager for this project is AECOM Hunt, 2450 South Tibbs Ave, Indianapolis, IN 46241. METHOD OF BIDDING Project will be constructed under a Multiple Prime Contract Bids. BP-1 - Mass Excavation, Grading, and Site Utilities BP-2 - Foundations BP-3 - Structural Steel BP-4 - Roofing Bids shall be based on a "stipulated sum" basis in full accordance with Bidding Documents prepared by LANCER+BEEBE, LLC, 220 N. College Ave, Indianapolis, IN 46202. Note that other bid packages for the balance of the Project will be released in late September, 2022. Bids shall be accompanied by AIA Document A305 Contractor's Qualification statement. Bids shall be accompanied by Contractor's FiLEGALS nancial Statement specific enough and in such detail so that the Owner can make a proper determination of the Bidder's capability for completing the project if awarded. A Bid security in the form of AIA Document A310, a certified check, Indiana General Revised Form No. 86, "Contractors Combination Bid Bond and Bond for Construction" or a form from an acceptable surety shall accompany each bid. The bid security shall be in the penal amount of 5% of the total bid price and made payable to the Owner. Bids shall be accompanied by the Contract Responsibility Certification (reference specification section 00 21 00). Should Bidder withdraw his bid within 60 days from bid opening date without written consent of the Owner or fail to execute a satisfactory contract with the Owner, the Owner may declare the bid security forfeited as liquidated damages. Prior to execution of the Contract, Bidder shall furnish Performance Bond and Payment Bond in the amount of 100% of the Contract Sum. Bonds shall remain in full force and effect for 12 months from date of acceptance of the work. DOCUMENT AVAILABILITY: Documents will be available on a deposit basis while supplies last. After the supply is gone, documents will be available on a non-refundable basis only. DEPOSIT will be refunded in full upon return of Construction Documents to Architect/Engineer in good condition within ten (10) days after date of Bid Opening. Any questions concerning bidding the project shall be directed to Luke Johnson, AECOM Hunt, luke.johnson@aecom.com TIME OF COMPLETION Work will be completed by a phased approach process. Commence Work within 48 hours after signing contract or receiving a notice to proceed and completion of work as follows: Commence Grading and Site Utilities: September 6, 2022 Building Dry-in/Roof Substantially Complete: August 30, 2023 Project Substantial Completion: June 15, 2024 Final Completion: July 15, 2024 OTHER PROVISIONS Mt. Vernon Community School Corporation does not discriminate on the basis of race, color, religion, gender, national origin, age, or individuals with disabilities, including limited English proficiency, in its programs or employment policies as required by the Indiana Civil Rights Act (I.C. 22-9.1), Title VI and VII (Civil Rights Act of 1964), the Equal Pay Act of 1973, Title IX (Educational Amendments), and Section 504 (Rehabilitation Act of 1973). PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a 100% Performance Bond/Labor and Material Payment Bond in the amount equal to the contract price, and such bond shall comply with all laws of the State of Indiana governing public contracts let by governmental units Project will be constructed under Multiple Prime Contracts. Current Early Release Bid Packages: 1. Bid Package #E-02 - Concrete Foundations 2. Bid Package #E-03 - Structural Steel Previously-awarded Bid Packages: 1. Bid Package #01 - Mass Excavation, Grading, & Site Utilities (awarded to Millennium Contractors, LLC) 2. Bid Package #E04 - Roofing (awarded to Insley Systems, Inc.) Any questions concerning bidding the project shall be directed to Luke Johnson, AECOM Hunt, luke.johnson@aecom.com.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents