Last Updated | 04/17/2023 08:27 AM |
Project Title | Tri-City Water Resource Recovery Facility (WRRF) Primary Clarifier Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Oregon City, OR 97045 (Clackamas County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $5,424,730 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Procurement Process and Technical Questions: Tralee Whitley at TWhitley@clackamas.us Project No.: 692260CH PW\DEN003\050083\692260 Background This contract consists of rehabilitating six primary clarifiers at the Tri-City Water Resource Recovery Facility (WRRF). The primary clarifiers are 125-ft long by 20-ft wide with an 18.75-ft side wall depth. Each basin is outfitted with longitudinal sludge/scum collectors, sludge cross collectors, and helical scum skimmers that were originally installed in 1985. Project Scope: The rehabilitation Project includes the following: o Replace existing longitudinal and cross collector mechanisms, helical scum skimmer, deteriorated launder troughs, and in-basin piping in Clarifier 1 through Clarifier 6. o Replace corroded electrical cabinet, conduits, and circuits in Primary Building. o Demolish existing abandoned HVAC equipment including hydronic heating system components. o Provide new HVAC air supply fans in Primary Building. o Provide combustible gas detection and alarming for Primary Building. o Replace door frames, doors, and hardware in Primary Building. o Repair substantial portions of existing primary influent channel and interior clarifier walls, floor, and head space of Clarifier 1 through Clarifier 6, by removing deteriorated concrete surface and providing new concrete repair products. Engineers Estimate: $8,300,000.00 Key Dates: All Basic Bid Work may begin as soon as the Notice to Proceed ("NTP") is issued Substantial Completion: September 30, 2025 Final Completion: November 1, 202 |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |