Last Updated 05/24/2019 04:37 AM
Project Title

Crash Barrier Repair 2019

Physical Address View project details and contacts
City, State (County) (Allegheny, Beaver, Lawrence Counties)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Description And Location Of The Project Is As Follows: For The Repair, Repositioning, And Maintenance Of Energy Absorbing Crash Barriers, And Other Miscellaneous Construction, As Indicated In The Bid Package For Various State Routes, In Allegheny, Beaver, And Lawrence Counties, Various Municipalities, Commonwealth Of Pennsylvania. This Project Being Situated As Follows: At Various Locations Throughout Allegheny, Beaver, And Lawrence Counties. 4501-0128 Square Yard 10.000 01** n Yes g Proj h.e.s. Plain Cement Concrete Pavement, 8" Depth Special 0608-0001 Lump Sum 1.000 01** n x Mobilization 4608-0011 Dollar 15,000.000 $1.00 $15,000.00 01** y Req x Std Pennsylvania Turnpike Insurance 0609-0004 Lump Sum 1.000 94 n x Inspector's Field Office And Inspection Facilities, Type c 0609-0016 Lump Sum 1.000 94 n x Std Equipment Package 4619-0600 Each 6.000 01** n Yes j3 Proj Permanent Impact Attenuating Device, Type v (Standard), Test Level 2 Modified 0619-0601 Each 1.000 01 n j1 Quadguard, Type v (Standard), Test Level 2 4619-0610 Each 2.000 01** n Yes j3 Proj Permanent Impact Attenuating Device, Type v (Standard), Test Level 3 Modified 0619-0611 Each 1.000 01 n j1 Quadguard, Type v (Standard), Test Level 3 0619-0616 Each 3.000 01 n j1, j3 Sci 100 Gm 0619-0617 Each 3.000 01** n j1, j3 Quest 0619-0618 Each 3.000 01 n j1, j3 Tau-Ii, Test Level 3 0619-0621 Each 3.000 01** n j1, j3 x-Tenuator 0901-0001 Lump Sum 1.000 01** n q Maintenance And Protection Of Traffic During Construction 4901-0204 Day 20.000 01** n Yes q Proj Arrow Panel Pennsylvania Turnpike Right Of Way 9000-0001 Each 30.000 01 n j3 Proj Repositioning Of Energy Absorbing Crash Barrier, Type 2 9000-0003 Each 5.000 01 n j3 Proj Repair Of Energy Absorbing Crash Barrier, Type 2 9000-0005 Each 150.000 01** n j3 Proj Repair Of Energy Absorbing Crash Barrier, g.r.e.a.t. Or Quadguard 9000-0006 Each 3.000 01 n j3 Proj Repair Of Energy Absorbing Crash Barrier, Type 2, Cluster Barrier 9000-0007 Each 5.000 01** n j3 Proj Repair Of Energy Absorbing Crash Barrier, Hex Foam Unit 9000-0008 Each 20.000 01** n j3 Proj Repair Of Energy Absorbing Crash Barrier, Tracc 9000-0009 Each 3.000 01 n j3 Proj Repair Of Energy Absorbing Crash Barrier, Tau-Ii 9000-0010 Each 10.000 01** n j3 Proj Repair Of Energy Absorbing Crash Barrier, Quest 9000-0011 Each 200.000 01** n j3 Proj Maintenance Of Energy Absorbing Crash Barrier, Tracc, g.r.e.a.t., Or Quadguard 9000-0012 Each 25.000 01** n j3 Proj Maintenance Of Energy Absorbing Crash Barrier, Type 2 Or Hex Foam 9000-0013 Each 3.000 01 n j3 Proj Repair Of Energy Absorbing Crash Barrier, Sci 100 Gm 9000-0015 Square Foot 15.000 01** n g1 Proj Repair Of Cement Concrete Pavement With Latex Mofified Mortar Or Latex Mofified Concrete 9000-0016 Hour 100.000 01** n x Proj Foreman 9000-0017 Hour 150.000 01** n x Proj Laborer 9000-0019 Each 10.000 01** n j3 Proj Remove Existing Type 2 Crash Barrier 9000-0020 Each 10.000 01** n j3 Proj Remove Existing Type 3 Crash Barrier 9000-0024 Each 20.000 01** n x Proj Premium Time Mobilization 9000-0036 Each 30.000 01** n j3 Proj Mushroom Bolt Assembly 9000-0038 Linear Foot 40.000 01** n j3 Proj Hi-Dro Or Hex Foam Diaphragm Assembly - Supply 9000-0041 Linear Foot 100.000 01** n j3 Proj Quadguard Diaphragm Assembly - Supply 9000-0047 Each 2.000 01** n j3 Proj g.r.e.a.t. Diaphragm Assembly - Supply 9000-0048 Each 2.000 01** n j3 Proj Fender Panel - Supply 9000-0057 Each 2.000 01** n j3 Proj g.r.e.a.t. Transition Panel - Supply 9000-0060 Each 2.000 01** n j3 Proj g.r.e.a.t. Cartridge, Type 51 - Supply 9000-0061 Each 2.000 01** n j3 Proj g.r.e.a.t. Nose Assembly - Supply 9000-0062 Each 4.000 01** n j3 Proj Hex Foam Nose Assembly - Supply 9000-0065 Each 4.000 01** n j3 Proj Hex Foam Cartridge, Type 80 - Supply 9000-0066 Each 4.000 01** n j3 Proj Hex Foam Cartridge, Type 81 - Supply 9000-0067 Each 3.000 01** n j3 Proj Hex Foam Cartridge, Type 82 - Supply 9000-0070 Each 2.000 01** n j3 Proj g.r.e.a.t. Thrie Beam Fender Panel - Supply 9000-0075 Each 150.000 01** n j3 Proj Quadguard Cartridge, Type i - Supply 9000-0076 Each 100.000 01** n j3 Proj Quadguard Cartridge, Type Ii - Supply 9000-0077 Each 1.000 01 n j3 Proj Tau-Ii, Cartridge a 9000-0078 Each 1.000 01 n j3 Proj Tau-Ii, Cartridge b 9000-0080 Each 150.000 01** n j3 Proj Quadguard Nose Cover - Supply 9000-0081 Each 20.000 01** n j3 Proj Tracc Stage 1&2 Rip Plates - Supply 9000-0082 Each 2.000 01** n j3 Proj Tracc Stage 3 Rip Plates - Supply 9000-0083 Each 10.000 01** n j3 Proj Tracc Nose Piece - Supply 9000-0084 Each 2.000 01** n j3 Proj Tracc Slot Plates - Supply 9000-0085 Each 2.000 01** n j3 Proj Tracc Fender Panel, 62" - Supply 9000-0086 Each 2.000 01** n j3 Proj Tracc Fender Panel, 35" - Supply 9000-0100 Dollar 100,000.000 $1.00 $100,000.00 01** y j3 Proj Unforeseen Equpment, Labor And Materials
Details
Division 01 - General Requirements, Temporary Barriers and Enclosures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents