Similar Projects
Centre Station
New Construction, Demolition - 4,058 SF
Conception
Brockton, MA

Keene Street Subdivision
New Construction
Conception
Duxbury, MA

Eagle Mill
New Construction, Renovation - 67,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Lee, MA 01238

Campello Place
New Construction
Design
Brockton, MA 02301

The Anglim Building
Renovation - 70,800 SF
Sub-Bidding
Less than $500,000 CJ est. value
Brockton, MA 02301

Disposition and Redevelopment of Real Property at 30 Columbia Street
Post-Bid
Adams, MA

Mixed Use Development Opportunity within the Downtown Trout Brook Redevelopment District
New Construction
Post-Bid
Brockton, MA 02301

Comprehensive Modernization Phase III C - General Bid
Renovation
Results
$1,520,000 to $2,700,000 est. value
Brockton, MA 02301

Accessibility Improvements Units 42A and 42B, Hemlock Drive 667-2 - General Bid
Renovation, Addition
Results
Less than $261,000 est. value
Bridgewater, MA 02324

Main Street Mixed Use
New Construction
Construction
Brockton, MA 02301

MacDonald Terrace Mixed Use
New Construction
Construction
Less than $500,000 CJ est. value
Scituate, MA 02066

Loring Boulevard Apartments
New Construction
Pending Verification
Plymouth, MA 02360

Rainier Colony Place Mixed Use
Renovation
Pending Verification
Plymouth, MA 02360

Main Street Redevelopment
New Construction, Renovation
Conception
Brockton, MA 02301

Rochester Crossroads
New Construction - 52,400 SF
Design
Rochester, MA

Last Updated 08/20/2021 08:14 AM
Project Title

Comprehensive Modernization Phase IIID - Interior Repairs - General Bid

Physical Address View project details and contacts
City, State (County) Becket, Brockton, MA 02302 (Berkshire, Plymouth Counties)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of but not limited to: Interior Modifications to existing living units at the kitchens and bathrooms and other miscellaneous finishes. Base Bid work includes four risers, 12, 13, 23 and 24, containing 30 units. Additional Alternate 1 Riser 11 and Alternate 2 Riser 9. Work per riser shall include the demolition of existing kitchens and bathrooms including asbestos abatement, kitchen cabinetry, all flooring, drywall and finishes, plumbing fixtures, miscellaneous waste and vent piping, hot and cold-water risers and piping within the units, and associated electrical work. Demolition includes a waste management plan. Provide new kitchen cabinetry, all flooring, drywall and finishes, plumbing fixtures, miscellaneous waste and vent piping, hot and cold-water risers and piping within the units, and associated electrical work. DCAMM Certificate Required.

Details

Apartments/Condominiums, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Asbestos Remediation, Asbestos Abatement.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Plumbing Piping.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents