Similar Projects
Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

143-Met
New Construction, Infrastructure - 339,070 SF
Design
$93,000,000 CJ est. value
Overland Park, KS 66223

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

2021 Crack Seal Program
Infrastructure
Results
Overland Park, KS

Waterline Improvements Project SRF Area D and C
Infrastructure
Results
Gardner, KS

Bubble Room Coin Operated Laundry / Shawnee
Renovation, Infrastructure - 4,203 SF
Construction
$160,000 CJ est. value
Shawnee, KS 66203

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Azura Credit Union / Mission
Renovation, Infrastructure - 2,295 SF
Pending Verification
$900,000 CJ est. value
Mission, KS 66202

Pizza Hut / Olathe
New Construction, Infrastructure - 1,880 SF
Pending Verification
$570,000 CJ est. value
Olathe, KS 66062

Levee Rehab Tri-County KS
Term Contract
Design
$25,000 to $100,000 est. value
Shawnee, KS

On Call Paving Improvements
Infrastructure
Post-Bid
KS

Prairie Trace West Sewer Interceptor
Infrastructure
Results
Gardner, KS

Lenexa Justice Center
New Construction, Infrastructure
Construction
$73,000,000 CJ est. value
Lenexa, KS 66215

North Restaurant - Lot 12 / Town Center Plaza
New Construction, Infrastructure
Pending Verification
$550,000 CJ est. value
Leawood, KS 66209

Last Updated 04/13/2023 10:18 AM
Project Title

Kill Creek Trail - Quail Meadows

Physical Address View project details and contacts
City, State (County) Gardner, KS 66030   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $498,314 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 13, 2023, project was awarded to Dondlinger Construction, awarded amount is $498,313.80 and the anticipated start time is mid May.** The City of Gardner is requesting bids for the Project: Kill Creek Trail - Quail Meadows, consisting of linear trail grading, concrete, ADA ramps, storm sewer pipe, box culvert placement, erosion control, seeding and misc. appurtenant items. Inquiries regarding the project should be directed to: Robert Davis, Staff Engineer 913.856.0918 rdavis@gardnerkansas.gov City Council Meeting: March 6, 2023 Substantial completion shall be achieved 60 calendar days from Notice to Proceed. Final completion shall be achieved 10 days hereafter.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents