Similar Projects
Snow Removal
Term Contract
Design
Hutchinson, MN 55350

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Removal of Asbestos - Pine Grove Manor - Phase 9
Alteration
Results
Little Falls, MN 56345

R4 Rochester South Invasive Woody
Term Contract
Results
Rochester, MN

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Selective Demolition and Temporary
Renovation - 20,000 SF
Construction
$78,500 CJ est. value
Saint Paul, MN 55116

Green Valley Greenhouse Expansion
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Ramsey, MN 55303

Abatement & Demolition
Demolition, Infrastructure
Post-Bid
Austin, MN 55912

Long Lake Sediment Basin Dredging
Infrastructure
Results
$1,147,615 CJ est. value
New Brighton, MN 55112

Environmental Assessment and Abatement Master Contract
Alteration
Post-Bid
Saint Paul, MN

Library Mechanical Rooms Asbestos Abatement
Alteration
Results
$80,000 est. value
Bloomington, MN 55431

Master Contracts for Environmental Assessment and Investigation Services
Term Contract
Post-Bid
Saint Paul, MN

Asbestos Abatement for MPHA Family Housing Expansion
Alteration
Results
$40,000 est. value
Minneapolis, MN

Water Contamination Testing
Term Contract
Post-Bid
Mounds View, MN

Abatement and Demolition Project
Demolition, Alteration
Results
$65,000 est. value
Lakeville, MN

Last Updated 01/06/2023 10:07 AM
Project Title

Sacred Heart School Abatement Project

Physical Address View project details and contacts
City, State (County) Sacred Heart, MN 56285   (Renville County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $292,222 [brand] Estimate
Plans Available from Civil Engineer - 11/17/22
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: 100 Elm St Sacred Heart, MN 56284 This work plan is issued for the hazardous material scope work for the Sacred Heart School Abatement Project. The scope of work encompasses the entire building area. The description of work and project requirements can be found in the project construction documents and bid package. Contractor is responsible for reviewing the project construction document and plans. In general, the scope of demolition work consists of selective abatement of building elements such as Floor Tile, Gym Flooding, Parapet/Seam Sealer, Doorways, Tanks & Duct Insulation and Miscellaneous gaskets, felts, and caulking. A supplemental pre-demolition asbestos and regulated materials survey, in preparation for the planned demolition following this abatement project, was conducted and completed by Bay West on October 18 and December 8, 2021. Any suspect ACMs were inventoried and sampled for asbestos content. AsbestosContaining Materials identified in the supplemental testing were from the following areas: o 7,350 square feet of 9"x9" floor tile, gray mottled/ mastic, black was identified as ACM throughout the 1929 building. o 200 linear feet of the white layer of caulking white, black was identified as ACM located along the building connection on the 1929 roof to the 1909 building. o 2,500 square feet of parapet tar/seam sealer were confirmed as ACM on the 1929 southwest roof section. o 4 doors of 10 square feet of boiler door insulation were identified as ACM in the 1929 basement boiler room. o 220 square feet of significantly damaged tank insulation identified as ACM in the 1929 basement boiler room. o 50 linear feet of 36" duct insulation identified as ACM in the 1929 basement boiler room The scope of work covered by this abatement work plan includes the removal, handling, and disposal of hazardous materials. This work plan does not include non-hazardous material work which will be performed as part of a later and separate contract to complete the demolition process. The Contractor shall complete the abatement work in full accordance with this work plan and meet all applicable requirements of the Renville County West Contractor Documents for this project. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing to the Issuing Office. Contact information and submittal procedures for such questions are as follows: 12224 Nicollet Avenue, Burnsville, MN 55337-1649, (952) 890-0509, fax (952) 890-8065

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents