Similar Projects
Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted
Post-Bid
FL

Replacement of Surficial Aquifer Well HR-8A
Results
Less than $477,330 est. value
Palm Beach Gardens, FL 33410

Deep Injection Well Monitoring Well MW-1 Replace
Results
West Palm Beach, FL

Well Drilling and Repair Services
Term Contract
Post-Bid
FL

General Injection Well Maintenance and Testing Services
Term Contract
Results
West Palm Beach, FL 33412

Upper Floridan Aquifer (UFA) Well Rehabilitation
Post-Bid
$1,800,000 est. value
Belle Glade, FL 33430

Construction Moss Pilot Project
Results
West Palm Beach, FL

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Post-Bid
FL

System-Wide Wellfield Improvements - Phase 1
Results
Less than $12,104,730 est. value
Boca Raton, Delray Beach, FL

Replacement of Surficial Aquifer Well No. 10
Infrastructure
Post-Bid
Palm Springs, FL

Water Treatment Plant Class I Injection Well System Mechanical Integrity Testing
Results
Less than $70,000 est. value
Wellington, FL 33414

Floridan Well Rehabilitation Program
Results
Jupiter, FL 33458

Secondary Effluent Yard Piping for Biosolids Hex Loop Upgrades
Results
West Palm Beach, FL 33417

Injection Well No. 2 Construction
Results
Delray Beach, FL 33445

Last Updated 09/09/2021 07:41 AM
Project Title

Water Treatment Plant No. 2 Treatment and Disposal Improvements Design Package 2 - Deep Injection Well

Physical Address View project details and contacts
City, State (County) FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,018,082
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct: one Class I injection well (IW-1), tubing and packer design with a final casing string of 26-inch outside diameter and total open-hole depth of 3,500 feet below pad level that may be permitted to accept an injection rate of approximately 9.69 million gallons per day (MGD) including the installation of wellhead components suitable for the connection and operation of a completed system; one associated dual-zone deep monitor well (DZMW-1) including the installation of wellhead components; four water-table monitor wells that will be either plugged and abandoned in place or completed with flush-mounted vaults and lockable caps at the end of the project; concrete slabs for well pads; secondary containment, waste brine storage tank, piping and pumps; asphalt and shellrock access road; and all electrical, instrumentation, piping, valves, pumps, paving, general civil site and other appurtenances for a complete fully functioning system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents