Similar Projects
Well #15 And #16 Rehabilitation and Upgrades
Infrastructure
Bidding
Albany, GA 31707

Charlie Butler Road Water Well
Alteration
Bidding
Midway, GA 31320

Warner Range Potable Water Well
Post-Bid
Columbus, GA 31901

Pearl Street Well Replacement
Post-Bid
Shellman, GA

Hinesville Main Pumping Station Bar Screen Replacement
Results
Hinesville, GA 31310

2020 Water System Improvements - Andrews Well 2
Results
Carnesville, GA 30521

Annual Contract For Cipp Rehabilitation
Alteration
Bidding
GA

Bypass Pumping Services on an Annual Contract
Term Contract
Post-Bid
GA

F. Wayne Hill Water Resources Center (WRC) Backwash Waste Pump Replacement
Results
Buford, GA 30519

Water Softening System
Infrastructure
Post-Bid
Mount Vernon, GA

Myers Middle School Boiler and Pumps Replacement
Results
Savannah, GA 31404

Drinking Water Filteration System
Renovation, Infrastructure
Post-Bid
Waynesboro, GA

2020 PWPF Improvements
Results
Less than $2,000,000 est. value
Cumming, GA

Well Inspection and Pipe Modification
Infrastructure
Post-Bid
Pembroke, GA

Pumping of Lift Stations and Pump Stations As-Needed
Term Contract
Results
Cumming, GA 30040

Last Updated 04/08/2022 08:51 AM
Project Title

Crosstown High Service 3 Pump/Motor Repair

Physical Address View project details and contacts
City, State (County) Fayetteville, Peachtree City, GA 30269 (Clayton, Fayette Counties)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project includes the removal, repair, and installation of one high service vertical turbine pump and motor at the Crosstown Water Treatment Plant (WTP). The high service pump is in the 2Mil Pump House at Crosstown WTP, 3500 TDK Blvd., Peachtree City, GA, 30269.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents