Similar Projects
Reconstructing Part of Lineville Road Phase 2 - County of Brown
Infrastructure
Conception
$11,400,000 CJ est. value
Green Bay, WI 54301

Reconstructing Part of Lineville Road Phase 2 - County of Brown
Infrastructure
Conception
$11,400,000 CJ est. value
Green Bay, WI 54301

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Perkins Park Ballfield Renovation
Infrastructure
Bidding
$200,000 CJ est. value
Green Bay, WI 54303

Fisk Park Tennis Court Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
Green Bay, WI 54303

Culvert Replacement and Hot Oil Chip Sealing
Post-Bid
WI

Crackfilling
Infrastructure
Post-Bid
De Pere, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

HMA Paving
Results
Howard, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

W Mason St, City of Green Bay Const / BRRHB Box Culvert
Infrastructure
Design
$250,000 CJ est. value
De Pere, WI 54115

Last Updated 01/19/2023 08:04 AM
Project Title

T Ledgeview, CTH MM; CTH G - IH 43

Physical Address View project details and contacts
City, State (County) Ledgeview, WI 54311   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $121,035 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

T. Ledgeview, CTH MM, CTH G - IH 43; Brown County; 4555-03-71, WISC 2023 157; CTH MM; 2.854 Miles; Rumble Strips, Signs, and Pavement Markings. Estimated Range $100,000-$249,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 21 - T. Ledgeview, CTH MM, CTH G - IH 43 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents