Similar Projects
Urgent Repair and Home Scattered Site Project
Post-Bid
Middlesex, Nashville, Rocky Mount, Tarboro, NC 27856

Olde Mill Stream
New Construction
Design
Rocky Mount, NC 27803

Old Spring Hope
New Construction
Design
Rocky Mount, NC 27804

Structure Repair at 1024/1026 Stokes Street
Results
Less than $146,000 est. value
Rocky Mount, NC

Urgent Repair and Housing Repair (7) Properties
Renovation
Results
Rocky Mount, NC 27801

New Construction for (8) Single-Family Houses at Vance Street
New Construction
Results
Rocky Mount, NC 27803

Urgent and Housing Repair 7 Properties
Renovation
Post-Bid
Rocky Mount, NC 27803

Construction of (2) Single Family Houses Whatley Cove - 909 and 913 Authority Drive
New Construction - 3,182 SF
Post-Bid
Rocky Mount, NC 27801

Urgent Home and Housing Repair
Results
Rocky Mount, NC 27801

Urgent Home Repair Eight Properties
Renovation
Post-Bid
Rocky Mount, NC 27804

Urgent Repair And Housing Repair (5) Properties
Renovation - 6,283 SF
Results
Rocky Mount, NC

Housing Repair Project
Renovation
Post-Bid
Rocky Mount, NC 27801

Construction of (8) Single-Family Houses
New Construction
Post-Bid
Rocky Mount, NC 27801

East Grand Property Demolition
Demolition - 2,500 SF
Results
Rocky Mount, NC 27801

Housing Repair and Urgent Repair Project
Renovation
Results
Less than $11,949 est. value
Rocky Mount, NC

Reported 12/01/2021 12:00 AM
Project Title

Housing Services 2020 CDBG-NR Neighborhood Revitalization Project

Physical Address View project details and contacts
City, State (County) Whitakers, NC   (Edgecombe County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is to provide technical housing services required under this program to implement the rehabilitation, reconstruction, demolition, clearance, and temporary relocation housing activities for the Project. Scope of Services: 1. The proposed activities to be included in the CDBG-NR Project are as follows: a. Reconstruction – 4 units b. Rehabilitation – 1 unit c. Demolition and asbestos removal – 4 units d. Temporary relocation – 5 units 2. Technical housing services required to implement the rehabilitation, reconstruction, clearance and temporary relocation housing activities will included but not limited to the following: a. Processing of client case files, including verification of income and eligibility for housing assistance b. Preparation of reconstruction housing specifications for replacement housing on site c. Preparation of rehabilitation housing specifications for housing repairs d. Preparation of clearance/demolition specifications e. Completion of bid processes for each housing activity, including preparation of bid packages, conducting bid opening, evaluating bids received and recommending bid award f. Preparation of contract documents, Truth in Lending documents and construction startup documents g. Conduct pre-construction conference to review CDBG-NR Project requirements, including non-discrimination provisions, Section 3 and related requirements h. Inspect work in progress at least two times per week and when contractor is working i. Process any change orders j. Authorize partial pay requests k. Conduct final inspection, authorize final payments and complete case closeout documents l. Assess client need for relocation assistance, locate comparable housing options, assist client in evaluating relocation housing options, assist client in purchase or rental of replacement housing unit, authorize relocation housing payments or rental assistance payments for relocation of client and obtain evidence of receipt of payment from client. m. Assess client need for temporary relocation, locate temporary housing options, assist client in selecting temporary housing unit, obtain executed lease, authorize lease/rent payments to landlord for temporary relocation of client n. Calculate moving allowance for client, process Moving Allowance Claim form, authorize payment and obtain evidence of receipt of payment from client o. Maintain cumulative beneficiary information as required by CDBG-NR regulations.

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents